This article is a selected article of “planner’s notes”. Loop Box
Day: June 24, 2022
State Council Office: indemnificatory rental housing is mainly small households with a construction area of no more than 70 square metersState Council Office: indemnificatory rental housing is mainly small households with a construction area of no more than 70 square meters
Fourth, reduce the tax burden and implement the price of civil water and electricity. After obtaining the confirmation of indemnificatory rental housing project, the preferential tax policies such as housing
Requirements and understanding of electrical part of gb50016-2014 code for fire protection design of buildingsRequirements and understanding of electrical part of gb50016-2014 code for fire protection design of buildings
Incombustible partition wall with fire resistance of not less than 2.00h and incombustible floor slab with fire resistance of not less than 1.50h shall be used to separate from other
[accident cases] selection of major and above accidents in the national construction industry in 2019 (III)[accident cases] selection of major and above accidents in the national construction industry in 2019 (III)
In July 2015, Chongqing Bayue construction and Installation Engineering Co., Ltd. The accident investigation team found out the process, causes and casualties of the accident, identified the nature of the
Discussion on issues related to the implementation of new income standards by architectural design enterprisesDiscussion on issues related to the implementation of new income standards by architectural design enterprises
“Qualified collection right” means that in the case of termination of the contract due to customers or other parties, the enterprise has the right to collect funds that can compensate
[Civil Engineering 2.12] construction area of operation platform and loading platform[Civil Engineering 2.12] construction area of operation platform and loading platform
Lifting Eye Unlock hidden skills: long press the picture to save, share it with the circle of friends, and gain more knowledge and happiness. End see this share, click it!..
Compilation of strong provisions of code for fire protection design of buildings! (current)Compilation of strong provisions of code for fire protection design of buildings! (current)
6 for the operation platform and maintenance platform in the plant, when the number of users is less than 10, the area of the platform may not be included in
The first national comprehensive natural disaster risk survey, housing construction and municipal facilities investigation and specialThe first national comprehensive natural disaster risk survey, housing construction and municipal facilities investigation and special
In view of the problems that still exist in the “two violations” inventory, such as the lagging progress of house investigation, the increase of the list of problems, the lack
Report | international cost management standard 3.0: global consistency of building life cycle costs and carbon emissionsReport | international cost management standard 3.0: global consistency of building life cycle costs and carbon emissions
The second part puts forward the hierarchical structure framework. Therefore, those familiar with the second edition will find that the third edition is almost indistinguishable except for the expansion of
Data | integrated installation instructions of BIPV photovoltaic building of a companyData | integrated installation instructions of BIPV photovoltaic building of a company
The password of this issue: 95554 (the file is pdf version, 24 pages). National tour, multiple issues per month ☝ Xi’an, Hefei, Changsha, Nanjing, Jinan, Wuhan Click the picture above