Five leading personnel such as the former party secretary, chairman, general manager and vice chairman of SMCC Construction Group Co., Ltd. Welcome to pay attention to the Online Knowledge Q
Day: June 28, 2022
Yuntai architecture classroom – “analysis of real problems in architecture” real problem analysis and teaching review of the 2022Yuntai architecture classroom – “analysis of real problems in architecture” real problem analysis and teaching review of the 2022
Examination requirement 1: the construction site area of 3500 square meters on the general plane should also be designed in the abandoned well pit with a depth of 100 meters.
Rogers has been here, and the buildings he left are always awakening people’s fun of walkingRogers has been here, and the buildings he left are always awakening people’s fun of walking
The building is a single story rectangular volume, and the structure can be clearly seen from the outer skin. The brilliance of science and technology supporting the “high-tech school” proves
AI + PKPM | give a building type drawing, and the structural design is fully automaticAI + PKPM | give a building type drawing, and the structural design is fully automatic
to realize the one click automatic generation from the structural scheme designed by artificial intelligence to the PKPM model based on the open API of PKPM. 7). The structural scheme
There are stories you have never seen in the four historic buildings in the source of the Bund in Shanghai! Free reservation ↓There are stories you have never seen in the four historic buildings in the source of the Bund in Shanghai! Free reservation ↓
Documentary photographer Xu Ming brought “1939 Shanghai aerial view illustration map animation”, which is a secondary creation based on “Shanghai aerial view illustration map”. The first batch of historical buildings
The best architecture program in 2021The best architecture program in 2021
Because architectural education is still Western design education, and most of Chinese ancient architecture is the inheritance of experience and depends on practice. The alkalinity of lime can prevent termites
Exclusive interview with Academician Ding lieyun: building will become the next intelligent terminalExclusive interview with Academician Ding lieyun: building will become the next intelligent terminal
In this issue, we will focus on Beijing Daxing International Airport and want to have an in-depth discussion with you on the architectural design of Daxing airport, especially the application
Interactive | the most “burning” building card of the royal family, there is no one!Interactive | the most “burning” building card of the royal family, there is no one!
Oh ~ according to the operation star below, we can get the latest content of [tribal conflict: Royal war] at the first time!.. In a hurry, the Blue King arranged
Dream workshop: urban open corridor / Hill architectureDream workshop: urban open corridor / Hill architecture
The construction period is from May 2019 to now. DreamWorks, located in Futian District, is a precious legacy left by our predecessors in this young city. △ vegetation and street
The park’s first construction permit in the new year, building the headquarters building!The park’s first construction permit in the new year, building the headquarters building!
As a top independent third-party laboratory in the industry, the company’s material analysis and failure analysis laboratory is equipped with a full set of high-end analytical instruments, an open professional