Edit: long head.. On September 20, a delegation led by Liu Peng, General Manager of Information Management Department of CSCEC Group, He Ting, Deputy General Manager of CSCEC Fourth Engineering
Day: September 29, 2022
Entering Xinfeng and Approaching Builders — The 2022 “Quality Month” Open Day was held in Hebei Xinfeng Engineering Testing Co., LtdEntering Xinfeng and Approaching Builders — The 2022 “Quality Month” Open Day was held in Hebei Xinfeng Engineering Testing Co., Ltd
According to the activity process, the participants watched the company’s promotional videos, understood the company’s basic situation, and observed the company’s laboratory on-site quality management; Watched the relevant material testing
Xiamen Guide for Registration and Assessment of Operation Qualification of Special Construction WorkersXiamen Guide for Registration and Assessment of Operation Qualification of Special Construction Workers
Magnetic Recess Former Certificate of physical examination qualification of hospitals at or above the county level in recent three months Note: The required materials can be quickly handled from the
Our company was invited to participate in the compilation of Technical Conditions for Self Waterproofing of Concrete Structures of BuildingsOur company was invited to participate in the compilation of Technical Conditions for Self Waterproofing of Concrete Structures of Buildings
It belongs to high performance concrete itself. The formulation of relevant standardized technical documents for waterproof concrete and its massive promotion and application, It is also a good implementation of
Zhengzhou Building Waterproof and Anticorrosion Industry Association – Association Daily Thursday, September 22, 2022Zhengzhou Building Waterproof and Anticorrosion Industry Association – Association Daily Thursday, September 22, 2022
At the same time, the company has also actively promoted the market development of building vibration reduction and isolation, rainwater management, light plastering gypsum, etc. 6. The above LPR is
Warmly congratulate Sichuan Guandish Construction Engineering Co., Ltd. on the smooth entry of Zhongliangshan Tunnel of Chongqing Rail LineWarmly congratulate Sichuan Guandish Construction Engineering Co., Ltd. on the smooth entry of Zhongliangshan Tunnel of Chongqing Rail Line
Automation equipment of the processing plant: As a construction unit, we are honored to participate in the construction of Zhongliangshan Tunnel of Chongqing Rail Transit Line 27. The line continues
Modern Architecture Institute carries out special work of apartment safety hazard investigation in the new semesterModern Architecture Institute carries out special work of apartment safety hazard investigation in the new semester
Through inspection, most student dormitories can strictly comply with the requirements of dormitory safety management, and consciously maintain the safety and health of the dormitories. Through this investigation, the distance
National Day Guangzhou Tower Research | Explore the development and changes of architecture and transportation in YangchengNational Day Guangzhou Tower Research | Explore the development and changes of architecture and transportation in Yangcheng
It shows the achievements of Guangzhou Metro in construction, operation and scientific research, and also brings popular science, geological knowledge and emergency common sense of the subway to every visitor.
[Construction engineering] The salary is 4000~8000, including board and lodging, subsidies, weekends and other benefits![Construction engineering] The salary is 4000~8000, including board and lodging, subsidies, weekends and other benefits!
Bachelor’s degree or above in law is required,; 2. Job responsibilities: for the transfer, storage and loading of finished products, Need to work with a certificate (if the customer’s finished
(Ying Mansion) One Hundred Thousand Silver to Build a Historically Protected Building (Old Western style House)(Ying Mansion) One Hundred Thousand Silver to Build a Historically Protected Building (Old Western style House)
After nearly a century of baptism, the house is still intact. Each room leads to the balcony and is distributed at both ends of the corridor; On the fourth floor,