The pink staircase is located in a prominent position in the main courtyard. In addition to meeting fire and evacuation requirements, the dreamy pink color inspires children’s imagination and exploratory
Day: August 26, 2024
First release: Reunion with Fei Li Wan – Jianyi Architecture Space DesignFirst release: Reunion with Fei Li Wan – Jianyi Architecture Space Design
This is an exquisite villa located on the banks of the Wulong River in Fuzhou, with a dual layout structure. fabricated frame scaffold The entire building, starting from the ground
[IBE] Common Problems in Building Design: Electrical Engineering 20-21[IBE] Common Problems in Building Design: Electrical Engineering 20-21
Quality | There are toilets, bathrooms, etc. located above the dispatch room and distribution room in the basement of the residential building. A mezzanine is now set up, but the
Deconstruction and Reconstruction: Innovative Thinking in The Box’s Outward Architectural DesignDeconstruction and Reconstruction: Innovative Thinking in The Box’s Outward Architectural Design
In the process of urban development, architecture is not only a container of space, but also a witness to cultural, historical, and social changes. swift lift clutches As urban renewal
Common Problems in Building Design – Electrical Issues (1-2)Common Problems in Building Design – Electrical Issues (1-2)
According to Article 5. 2. 1 of the General Code for Building Energy Efficiency and Renewable Energy Utilization GB 55015-2021, new buildings should be equipped with solar energy systems. waco
Common Problems in Building Design: Prefabrication (1)Common Problems in Building Design: Prefabrication (1)
Is the individual building area referred to in the “Implementation Opinions of the General Office of the Beijing Municipal People’s Government on Further Developing Prefabricated Buildings” document (Jingzhengbanfa [2022] No.