Construction project management [6]


determine the answer according to the confidentiality level of the largest document: Click to view answer 6 When the construction drawing is used to change the as built drawing, the basis for change and modification must be indicated; In case of any major change in the structure, process and layout of the construction drawing, or the changed part exceeds the drawing surface (), the as built drawing shall be redrawn.

safety officer, D.

land saving answer: Click to view the answer..

convert the quality objective value into the actual value of quality, D.

cost saving, C.

energy saving, D.

carry out various inspections during the implementation of the plan, e.

A.

formulate accident treatment plan → accident cause analysis → accident investigation → accident treatment → accident treatment appraisal and acceptance → submit treatment report, C.

Clarify the quality objectives, B.

inspection lot, e.

announce accident handling results.

Unit works, B.

treatment of solid waste, e.

C.

prevention and control of noise pollution, D.

According to the consequences of the safety accident, the accident belongs to ().

When filing construction documents, he lists three top secret documents of different levels into the same file (confidential volume).

sound energy of noise answer: Click to view answer 11 In the process of safety responsibility accident investigation, the responsibilities of the accident investigation team include ().

A.

Accident cause analysis → formulate accident handling plan → accident investigation → accident handling → accident handling appraisal and acceptance → submit handling report, D.

Acceptance of inspection lot means that the project has passed the completion acceptance.

security information answer: Click to view answer 8 In the P cycle, the planning function of quality management mainly includes ().

A.

Be classified as top secret, B.

single works, C.

major accident, D.

major accident, C.

the qualification of relevant data must be checked for acceptance of inspection lot.

analyze the causes of quality problems or quality nonconformities and take measures to correct them.

Find out the cause, process, casualties and economic losses of the accident, B.

The quality of main control items and general items has passed the sampling inspection.

The confidentiality of the construction documents of the project shall be ().

divisional works, D.

Answer: Click to view answer 12 The environmental protection measures of the construction project mainly include ().

determine the person responsible for the accident, C.

be classified as secret, C.

Answer: Click to see answer 9 The basic units of quality acceptance are ().

project chief supervision engineer answer: Click to view the answer 4 During the pile foundation construction of a bridge project, 6 people were killed and 52 seriously injured due to the overall collapse of the operating platform, with a direct economic loss of 1.18 million yuan.

Person in charge of the construction unit, B.

poor quality of scaffold fasteners, e.

1.

potential energy of lifting heavy objects, C.

material saving, e.

The correct procedure for handling construction quality accidents is ().

A.

493 of the State Council), after the occurrence of production safety accidents, the injured or the first person to find the accident shall immediately report to () by the fastest means.

A.

economic information, D.

Prevention and control of air pollution, B.

Organization information, B.

rupture of cable insulation, D.

the standard for acceptance of inspection lot is that the main control items have passed the inspection.

be classified as secret, D.

Socket Data Clip

A.

particularly major accident answer: Click to view answer 5 Xiao Zhang is the full-time Archivist of the general contracting project Department of company A.

Formulate accident treatment plan → accident investigation → accident cause analysis → accident treatment → accident treatment appraisal and acceptance → submit treatment report, B.

Shock wave caused by boiler explosion, B.

accelerated construction measures answer: Click to view answer 13 The four sections of “four sections and one environmental protection” of green construction refer to ().

Water saving, B.

project manager, C.

accident investigation → accident cause analysis → formulate accident handling plan → accident handling → accident handling appraisal and acceptance → submit handling report answer: Click to view answer 2 According to the unified standard for construction quality acceptance of Building Engineering (g50300-2001), one of the provisions for the quality acceptance of the inspection batch is ().

A.

A.

General accident, B.

divisional works answer: Click to view answer 10 The following hazards belonging to class I are ().

management information, C.

Answer: Click to view answer 3 According to the regulations on reporting, investigation and handling of production safety accidents (Order No.

prevention and control of water pollution, C.

A.

B.

A.

A.

put forward suggestions on accident handling and preventive measures, D.

formulate the action plan to achieve the quality objectives, C.

A.

1 / 3, b.1/2, c.1/4, d.1/5 answer: Click to view answer 7 In the project information classification, which of the following is not classified by project management function ().

D.

A.

write accident investigation report, e.

Tags:

Related Post