The original measures of Shanghai Municipality for the administration of pilot projects of general contracting of projects became invalid.
If the credit evaluation of the construction enterprise is greater than or equal to 60 points, it is qualified.
Units that have not obtained the qualification of special package of formwork and scaffold shall not engage in the construction of scaffold and high-altitude operation basket project, and the personnel shall obtain the qualification certificate of special operation! This regulation will be implemented from March 1, 2022 to March 1, 2024.
When appointing the project director, the supervision unit shall comply with the following provisions on the number of Posts: the project director can concurrently serve as a member of the supervision organization of three engineering projects at most, but shall obtain the written consent of all the construction units; The project director of a major construction project shall not concurrently serve as a member of the supervision organization of other projects..
Enterprises with construction safety accidents, arrears of workers’ wages, subcontracting, illegal subcontracting, qualification affiliation, no normal operation for a long time after obtaining the qualification certificate and being complained and reported will be listed as the key objects of daily verification.
If it is found that the enterprise no longer meets the requirements of qualification standards, it shall be ordered to make rectification within a time limit, and the rectification period shall not exceed 3 months.
3.
Approval conditions: assets that meet the requirements of qualification standards; Have enterprise technical directors, registered constructors, technicians with professional titles and skilled workers who meet the requirements of qualification standards; Have necessary technical equipment; The above-mentioned personnel shall be no more than 60 years old, and the enterprise shall pay social insurance for them for no less than one month.
If it fails to make rectification within the time limit or still fails to meet the requirements after rectification, the administrative license decision and qualification certificate will be withdrawn according to law.
Verification: for enterprises that have obtained qualification through notification commitment system, our bureau will carry out qualification verification on them, focusing on the insurance participation and on-the-job arrival of key personnel of enterprises such as office space, registered constructor, technical personnel with professional titles and technical director.
The main contents of this revision are as follows: 1.
4.
6.
2.
Delete the bidding initiation, contract form, risk guarantee or insurance clause.
Official notification link: http://zjj.sz.gov.cn/csml/jzscyztbjgc/xxgk_284/tzgg_285/content/post_9496028.html031 On March 7, Wenzhou housing and Urban Rural Development Bureau issued the notice on printing and distributing the guidelines for digital review of construction drawings of construction projects for citizens in Wenzhou (for Trial Implementation), which will be implemented from March 1, 2022.
From March 1, 2022, a number of new regulations in the construction industry will be officially implemented.
Effective from March 5, 2022 and valid for 5 years.
Electronic and intelligent engineering professional contracting level II fire fighting facilities engineering professional contracting level II waterproof, anti-corrosion and thermal insulation engineering professional contracting level II building decoration engineering professional contracting level II building curtain wall engineering professional contracting level II nuclear engineering professional contracting level II offshore oil engineering professional contracting level II formwork scaffold professional contracting regardless of grade note: enterprises apply for qualification addition, upgrading Continuation, reorganization and separation are not within the scope of the notification commitment system.
5.
Official notification link: https://jst.nx.gov.cn/info/1007/31373.htm Annex: Regulations on the management of attached lifting scaffold and hanging basket for high altitude operation in Ningxia construction (Draft for comments) Docx05 Shenzhen Municipal Bureau of housing and urban rural development issued a number of regulations regulating the employment behavior of project managers and chief supervision engineers in Shenzhen.
Guidelines for digital review of construction drawings of civil construction projects in Wenzhou (Trial) (review chapter) Pdf04 the Department of housing and urban rural development of Ningxia Hui Autonomous Region issued a notice on Soliciting Opinions on the Interim Provisions on the management of attached lifting scaffolds and hanging baskets for high-altitude operation in Ningxia construction (Draft for comments).
Scope of notification commitment system: the first application of 8 construction enterprise qualifications approved by our bureau.
For details, click the link: heavyweight! The measures for bidding and bid evaluation of general contracting projects in Shanghai were issued, and the evaluation of credit bids was added! Effective from March 1, 2002, Shenzhen Municipal Bureau of housing and urban rural development issued a notice on further promoting the pilot reform of notification commitment system for qualification examination and approval of construction enterprises.
Adjust the bid evaluation method: the original “comprehensive evaluation method I and comprehensive evaluation method II” is adjusted to “reviewed reasonable low price method and comprehensive evaluation method”.
If the qualification certificate is verified to be qualified, the enterprise can log in to the “three libraries and one platform” system to apply for “re certification” and renew the qualification certificate with a validity period of five years before the expiration of the qualification certificate.
Prequalification evaluation: if the number of applicants is less than or equal to 7, no prequalification will be conducted.
It will come into force on March 1, 2022, with a trial period of 2 years.
A registered constructor shall not serve as the project manager of two or more construction projects at the same time, and shall not concurrently serve as a member of the construction management organization of other projects.
Add credit bid evaluation.
If the verification is unqualified, the qualification certificate will automatically become invalid after one year of validity.
Attachment: 1 Guidelines for digital review of construction drawings of civil construction projects in Wenzhou (Trial) (design part) pdf2.
Add evaluation separation.
Survey and design enterprises are qualified if their credit rating is greater than or equal to 65 points.
What are they? Is it about you? Let’s see! From March 1, 2013, the new version of measures for bidding and bid evaluation of general contracting in Shanghai will be fully implemented.
The full score of credit proposal is 5 points, the full score of technical proposal is 30 points, and the full score of commercial proposal is 65 points.
Supervision: if fraud is found, the Municipal Bureau will revoke the administrative license decision and qualification certificate according to law and publish its illegal acts on the public service platform for construction market supervision of Guangdong Province.
2.
1.
The enterprise shall not apply for the administrative license again within three years.
Sign the letter of commitment for notification of administrative license of construction enterprise qualification, and promise to meet the requirements of qualification standards.
The bid terms and technical bid review factors shall be listed separately.
The credit rating of each party of the consortium shall be greater than or equal to the qualified score.