Building tie rod @ building anti falling beam tie rod @ building longitudinal anti falling beam tie rod @ Guang’an building longitudinal


The longitudinal anti falling beam tie rod of the bridge is connected with the embedded parts of the anti falling beam stop when installed, and is usually installed next to the support and on the side close to the centerline of the line.

Based on the principle of good faith and mutual benefit, our company sells directly to manufacturers.

Scan the QR code above and add friends.

New and old customers are welcome to call for consultation.

Corn Magnetic Box

In order to prevent beam falling and collision damage caused by earthquake, the bridge longitudinal anti falling beam tie rod needs to improve the corresponding seismic measures of the bridge, so the bridge longitudinal anti falling beam tie rod is applied.

Contact person: Manager Zhang Tel: 18603183602 (wechat synchronization).

Welcome to call to negotiate business.

The longitudinal anti falling beam tie rod of the bridge is generally to prevent the safety performance of the beam structure under the action of special loads such as seismic force.

The anti falling beam facilities are set between the beam and the pier, generally to prevent the transverse or longitudinal displacement of the beam under the load such as seismic force.

1860318360218631813302 building tie rod @ building anti falling beam tie rod @ building longitudinal anti falling beam tie rod @ Guang’an building longitudinal anti falling beam tie rod @ customized drawing of longitudinal anti falling beam tie rod.

We will serve you wholeheartedly!..

When it is installed in the air, it is only to prevent the transverse or longitudinal displacement of the beam, not the load-bearing structure.

specializes in the production and sales of bridge bearings, bridge expansion joints, basin supports, guardrail supports, rubber airbags, rubber Waterstops, water swelling Waterstops, two-component sealant, one-component polyurethane sealant, Single component water expansion water stop glue, temporary sand bucket bearing, gathering well, wiring box, polyethylene closed foam board, precast beam seat block, water stop steel plate, steel plate putty water stop, sealing belt hot melting machine, pipe sealing airbag, wedge steel plate, bridge longitudinal drawbar, pull rod, anti falling beam buffer device, tunnel ring rubber plate, and other bridge related accessories and installation construction Luqiao maintenance project.

The company has 24-hour free technical consultation.

Hebei Zhonggu Engineering Rubber Co., Ltd.

The anti falling beam device includes anti falling beam buffer module, anti-collision beam buffer module, connecting rod, fastening bolt, embedded steel pipe and other main components.

Tags:

Related Post