Special thanks in 2022 of the 1950s: Hangzhou cultural relics heritage and historical building protection center, Zhejiang Daily newspaper group, Hangzhou Silian Industry Co., Ltd., original statement of Dengyun Road community: other platforms if necessary.
As the earliest “national brand” construction army in China and the province, Zhejiang construction first company (Zhejiang construction first company) has been engaged in the tide of socialist construction since its establishment in 1949.
Zhejiang Daily and Hangzhou Daily, the first assembly plant in the province, have reported the construction progress of the project for many times (Note: Zhejiang first construction was called “the fourth construction site of local state-owned Zhejiang construction engineering company”).
The female workers of the classic silk union factory of the “classic project” are selecting cocoons.
During the preparation process, the first builder repeatedly reviewed and modified the drawings in the spirit of saving state-owned assets, adopted a large number of substitutes and utilized waste materials, saved a total of 1.59 million yuan of reinforcement, cement and wood, and reduced the cost below the planned indicators.
Tens of thousands of components, such as beams, columns, roof trusses, roof slabs, etc., are prefabricated before mobilization, and then directly hoisted and installed after mobilization.
3.
After [No.1 “construction” as before], the old No.1 Construction Co., Ltd.
The construction period is the order, and the construction site is the battlefield.
The craftsman of the first construction of the zigzag roof of Hangzhou silk union workshop built the roof into a zigzag roof and a plain brick wall.
In 1966, after the completion of the third phase of Hangzhou silk union project, it became the largest silk printing and dyeing enterprise with the most advanced technology and the strongest processing supporting capacity in the national silk industry at that time, and was known as the “largest factory in the Far East”.
In addition, the first construction company has built a large auditorium, broadcasting station, library, swimming pool, kindergarten, primary and secondary schools, workers’ University, health center, staff canteen, collective dormitory for this state-owned large factory…
Just after entering the scene, Zhejiang Yijian and Hangzhou silk union jointly put forward the slogan of “three works (hard work, clever work and hard work) for 60 days, and strive to produce printed and dyed silk at the end of the year”.
The old factory buildings in the 1950s are glowing with charming vitality and vitality in the new era.
The first construction team adopted the new construction method of prefabricated components in the plant construction, and also built a new concrete component prefabrication plant for this purpose.
In 2010, the “Hangzhou silk link” building was listed in the fifth batch of historical building protection list by Hangzhou municipal government.
In 2007, hangsilian was recognized as an industrial heritage protection unit in Hangzhou, and founded 166 cultural and creative parks, which were rated as one of the top ten characteristic cultural and creative parks in Zhejiang Province.
Zhejiang No.1 Construction Co., Ltd.
is creating a classic.
In order to prevent the project quality from being affected by the foundation water inflow, the construction workers have successively implemented three shift and two shift construction, and carried out a competition among all staff to fill the “progress bar” of construction and production.
has opened a column about the old No.1 Construction, now we launch [No.1 Construction classic] classic buildings and classic memory columns to review historical buildings, reflect on the craftsman spirit, and create a sense of enterprise.
The construction of “classic project” is hard work, clever work and hard work.
1 Introduction to the “classic project” the gate of the former Hangzhou silk link factory in 1956, the first engineering division (Zhejiang first construction) of Zhejiang construction company (Zhejiang construction group) took up the construction banner of Hangzhou silk link, a key project during the first five year plan period of new China, which was personally approved by Premier Zhou Enlai.
During the construction period, the first construction personnel and the people of Hangzhou silk union slept in thatched cottages, ate pot vegetables, worked overtime to pay attention to construction, dug soil with shovels, built railway tracks and transported sand, and with the roar of machines, they were at full power to make a difference in the tide of socialist construction.
The hardware of the people’s factory can be said to be complete.
In January, 1984, as the only silk industrial enterprise, Hangzhou silk union was listed in the “100 items of construction in modern China”.
The first assembly plant in the province is taking shape.
The total investment of hangsilian aerial view project is 50million yuan.
After the first phase was completed and put into operation in 1958, Hangzhou silk union has achieved good performance every year, with a profit of 9.9 million yuan a year, which is equivalent to recovering half of the investment in building the plant in one year.
The interior is in the form of transparent concrete structure beams and columns, which meets the technological requirements of lighting, ventilation, heat dissipation and so on in the silk industrial workshop.
This method can quickly promote the progress of the project, and the quality fully meets the design requirements.
The first corbel column at the earthwork construction site was hoisted, and the chimney and boiler room prefabricated column beam were assembled.
Zhang Guoxian, the former director of Hangzhou silk union printing and dyeing branch, recalled the plant construction scene “Zhejiang construction Iron Army goes to battle!” This is the first impression of the Iron Army of Zhejiang construction when Zhang Guoxian, the outstanding director of Zhejiang Province and the former director of hangsilian printing and dyeing branch, recalled the scene of plant construction.
The construction tasks are all entrusted to Zhejiang construction company, and the scheme is designed under the guidance of the first branch of the Soviet national design institute.
The first phase of the project includes three major projects: Reeling plant, heating station and warehouse, with a construction area of more than 15000 square meters.
The total area of phase III house is 94279 square meters, which is the first silk production plant in China and the largest in Southeast Asia.