How to determine the embedded layer of building structure mountain building?


However, for mountain buildings, especially those with towers on the basement, the outdoor ground elevation of the basement varies greatly, and the height of the tower cannot be calculated from the outdoor ground.

It’s full of dry goods.

It is a simple and clear problem.

He Jianbo, deputy chief engineer of CSCEC southwest design and Research Institute Co., Ltd., the second national mountain building structure technology exchange meeting, July Kunming online course, recent activities of scientific and technological novelty search, the second national engineering structure vibration reduction and isolation technology exchange meeting and Tongxin zhumeng · structural outstanding youth China trip (East China Station), September 5-7, 2019, Shanghai 17th International Wind Engineering and structural engineering advanced training course (ias17) August 30 – September 1, 2019 Beijing 15th International Wind Engineering Conference (icwe15) September 1-6, 2019 Beijing Japan residential interior and exterior decoration parts industrialization production and standardization inspection September 8-13, 2019 Japan prefabricated building and full decoration industry industrialization inspection November 10-15, 2019 Japan Click “here” to.

Therefore, the height of the building is generally taken as the height of the building.

I’ll share it with you.

Cast in Sockets

Therefore, it is necessary to first determine the location of the embedded layer of the tower to clarify the height of the building, and then clarify whether the building belongs to multi-storey or high-rise buildings, the maximum applicable height, structural scheme, slope excavation and support scheme, etc, Based on this, various regulations related to the height of the house and the value standard of structural design in the specification shall be implemented.

hejianbo, deputy chief engineer of China Southwest Architectural Design and Research Institute Co., Ltd., made a wonderful report on the topic of “an important link in the structural design of mountain buildings – selection of embedded layers (Taking Guiyang Street project as an example)”.

Mr.

As the embedded layer of superstructure, it will not be paid attention to in the general design of building structures, and it is rarely discussed specifically.

On July 26-27, 2019, “the second national mountain building structure technology exchange meeting” was successfully held in Kunming (click to view the report after the meeting), and more than 300 representatives from all over the country attended the meeting.

Tags:

Related Post