It is a necessary skill for designers to be able to draw construction drawings.
The operation is not flexible enough, resulting in slow drawing and total overtime; Designers who lack skills in drawing, resulting in ineffective work; Highlights of the veteran designers who want to systemically sort out or check and fill gaps: 1.
Refining: put an end to invalid content, share dry goods in the whole process, and obtain knowledge most efficiently.
Comprehensive: the course covers everything from basic operation to practical drawing to energy saving to graphic printing; 2.
Course harvest: supporting services: 1.
Play at double speed (PC, APP); 2.
The original price of the official course of Zhuolong society is 199 yuan, and the official account is 10% off.
Meticulous: various drawing details/toolbar explanation/comprehensive coverage of operation skills; 3.
Video.
They include “construction drawing details / building energy saving standards”.
Actual combat: take you hand in hand to learn and operate step by step; 4.
After two years of work, they can basically draw independently, but being able to draw does not mean being able to draw well.
Note: Please fill in the receiver’s mobile phone number correctly, Instructor: suitable for the crowd: the novice construction drawing designer wants to learn the system of construction drawing drawing software.
Slow drawing leads to overnight drawing rush or a family meal!!! Why? In the final analysis, it is due to unskilled software operation, lack of drawing skills, incomplete understanding of upstream and downstream, and incomplete understanding of project details, The excellent courses “detailed explanation of CAD (Tianzheng) architectural construction drawing design and drawing” and “detailed explanation of CAD (Tianzheng) architectural construction drawing design and drawing” which make CAD drawing and construction drawing drawing drawing drawing drawing easy to use have a total of 47 sessions and a course length of 20 hours.
Click on the small program below to buy the course.
Being asked to change the drawing by leaders, being asked to change the drawing by schemes, and being asked to change the drawing by water, heating, and electricity.