Beijing municipal local standard “Construction process specification for construction and installation subdivisional works Part 22:


After discussion and revision, the draft of the Code was improved.

Contact: Wu Dawei Tel: 010-55598482 Fax: 010-55597148 E-mail: jwbzzqyj@163.com Mailing address: Beijing Municipal Commission of Housing and Urban-Rural Development, No.

Check the original text.

The Code is consistent with the relevant national and local standards in Beijing, with detailed contents and strong practicability and operability.

2.

On June 21, 2021, the preparation team held a kick-off meeting for the preparation of the standard, introduced the preparation background, purpose, significance and preliminary research results of the Code, discussed the preparation outline, and determined the preparation outline and task division.

On August 19, 2021, the preparation team held the second discussion meeting to discuss and revise the first draft of the Procedure.

2、 The main drafting unit is Beijing Urban Construction Science and Technology Promotion Association, Beijing Residential Group Co., Ltd., Beijing Residential Building Design and Research Institute Co., Ltd., III.

doc2.

The Specification specifies and requires the whole process of material mobilization, installation process, installation quality, transportation and storage of prefabricated decoration engineering construction, and puts forward requirements for quality control and acceptance of prefabricated decoration engineering.

7.

On March 25, 2022, the preparation team held the third discussion meeting to further improve the preparation content of the Procedure.

9, Daji Street, Tongzhou District, Beijing (please mark the words “comments collection” on the envelope) Annex: 1.

4、 General principles of main structure catalogue 1; 2 Basic regulations; 3.

Construction Process Specification for Construction and Installation Sub-divisional Works Part 22: Assembled Decoration Works Drafting instruction.

4.

Construction Process Specification for Construction and Installation Sub-divisional Works Part 22: Assembled Decoration Works (draft for comments).

6、 Other matters have no source: the Municipal Housing and Urban-Rural Development Commission pays close attention to this place and works together without deviation.

6.

Installation of integrated light steel keel partition; 4.

doc3.

5.

The procedure specifies the installation process of the main prefabricated components and connections of the prefabricated decoration project, and is prepared according to the material requirements, main machines and tools, operating conditions, construction technology, quality standards, finished product protection, and precautions.

Lifting Socket

doc The Beijing Municipal Commission of Housing and Urban-Rural Development drafted instruction 1 on January 6, 2023.

The task source is to formulate the Beijing local standard “Construction Process Specification for Construction and Installation Subdivisional Works Part 22: Assembled Decoration Works” (hereinafter referred to as the “Procedure”) according to the requirements of the original Beijing Municipal Bureau of Quality and Technical Supervision “2018 Beijing Local Standard Preparation and Revision Project Plan” (JZF [2018] No.

If the content of this standard involves patent/trademark rights, please feed back the relevant information together.

On July 10, 2021, the preparation team held the first discussion meeting to discuss and revise the contents of the Procedure and form the first draft.

The main drafting process was 1.

A drafting group was established on December 25, 2020 to investigate the revision of the Code, collect expert opinions and analyze and summarize issues such as the increase and decrease of chapters and the compilation paradigm, and initially form the preparation outline of the Code.

Concrete wall hanging plate construction; 7.

3.

Feedback form.

20).

Notice on Public Solicitation for Comments on the Beijing Local Standard “Construction Process Specification for Construction and Installation Sub-divisional Works Part 22: Assembled Decoration Works” According to the Beijing local standard, the project plan has been revised, and the draft of the Beijing local standard “Construction Process Specification for Construction and Installation Sub-divisional Works Part 22: Assembled Decoration Works”, organized by the Beijing Municipal Commission of Housing and Urban-Rural Development, has been completed, According to the requirements of the Beijing Local Standards Management Measures, opinions are now openly solicited online, and valuable suggestions are welcome.

On September 8, 2022, the preparation team revised and improved the first draft of the Procedure to form a draft for comments.

Please fill your comments in the “Feedback Form” and send them to our committee by fax, e-mail or mail before February 6, 2023.

5、 Main contents This Code is applicable to the prefabricated decoration works in the construction of construction projects in the administrative area of Beijing.

Fabricated batten partition; 5 Modular construction of prefabricated partition; 6.

In November 2022, the preparation team solicited comments and improved the content of the standard.

Installation of prefabricated ceiling without suspender in kitchen and toilet; 8 Assembled ground installation; 9 Overall toilet construction; 10 Construction of integrated toilet.

Tags:

Related Post

Prefabricated, Bim and intelligent construction have been mentioned many times, which is the inevitable choice for the transformation of thePrefabricated, Bim and intelligent construction have been mentioned many times, which is the inevitable choice for the transformation of the

Recently, prefabricated, Bim and intelligent construction have been mentioned many times. 03 building information model (BIM) technology application demonstration project is an engineering project that applies BIM Technology in the