Investigation Report on General Hoisting Injury Accident of Shandong Shunda Jiye Construction Engineering Co., Ltd. on “5 · 20” in Huaiyin


Class I qualification for professional contracting of foundation works.

Investigation Report on General Lifting Injury Accidents of Shandong Shunda Jiye Construction Engineering Co., Ltd.

11667, Second Ring West Road, Shizhong District, Jinan, Shandong Province; Legal representative: Hu Moujing; Date of establishment: December 26, 2017; Business scope: general contracting of construction engineering, subcontracting of construction labor, specialized contracting of foundation engineering, specialized contracting of building decoration engineering, foundation engineering construction, etc.

The inspection is valid until August 2022, and the mandatory scrapping period of the vehicle is August 24, 2039.

The members of the investigation team investigated the accident site.

General Lifting Injury Accident Investigation Group”, and invited the District Supervision Committee and the District People’s Procuratorate to send personnel to participate.

(2) Accident rescue situation After the accident, Han Mouguo and Yan Mouchao immediately carried out rescue.

According to the Law of the People’s Republic of China on Work Safety (implemented on September 1, 2021), the Regulations on the Reporting, Investigation and Handling of Work Safety Accidents (Order No.

On May 24, 2022, the Safety Committee of Huaiyin District organized the on-site meeting of accident warning education, consulted relevant information, investigated, inquired and obtained evidence from relevant personnel, conducted a comprehensive investigation and analysis of safety management, identified the cause and nature of the accident, and put forward suggestions on accident treatment and preventive and corrective measures.

Han Mouguo, a crane driver found by Yan Mouchao in the crane WeChat group, holds the “construction machinery construction operation certificate in the construction industry”, and the review date is February 23, 2024.

Pressed Swivel Coupler

employed Yan Mouchao to lift the conduit, Yan Mouchao employed Han Mouguo as the crane driver, and Xu Mouyong, a migrant worker, as the lifting assistant.

in Huaiyin District at about 18:00 on May 20, 2022, Shandong Shunda Jiye Construction Engineering Co., Ltd.

At 18:01, Yan Mouchao dialed 120 for rescue.

2、 Accident process and emergency response (I) Accident process: On May 20, 2022, the employee Xu Mouyong, the crane driver Han Mouguo, and the team leader Yan Mouchao lifted the conduit in the middle of the south side of the TOD complex construction project site of Jinan West Passenger Station.

About 20 minutes later, 120 ambulance vehicles arrived at the scene, and Xu Mouyong was sent to Jinan Fifth People’s Hospital for treatment.

Shandong Shunda Jiye Construction Engineering Co., Ltd.

Xu Mouyong is responsible for hanging the lifting lug to fix the conduit and removing the lifting lug after the conduit is hoisted in place and slowly landed.

and the industrial competent department Huaiyin District Housing and Urban-Rural Development Bureau in terms of safe production, cadre style, construction of a clean government, involvement in crime and other aspects, No related problems were found.

The accident investigation team carried out the accident investigation in a scientific and rigorous manner in accordance with the principles of “four never let go” and “scientific and rigorous, legal and regulatory, practical and practical, and practical”.

Basic information of the accident (1) Basic information of the accident unit: Jinan Longhu Shigao Real Estate Development Co., Ltd., unified social credit code: 91370100MA7DB33W0J; Type: other limited liability companies; Registered capital: one hundred and fifty million yuan only; Registered address: Room 208, the second floor, No.

On December 26, 2021, Jinan Longhu Shigao Real Estate Development Co., Ltd.

The vehicle is purchased by individuals, and the owner is Zhao Aixiang, Yan’s wife.

The investigation is reported as follows: 1.

157, Dianbei Road, Huaiyin District, Jinan, Shandong Province; Legal representative: Xing Mouhao; Date of establishment: November 29, 2021; Business scope: real estate development and operation.

When the fourth catheter was hoisted at 18:00 on May 20, after one end of the catheter landed on the ground, the lifting lug slipped, causing the other end of the catheter to tilt quickly and hit Xu Mouyong on the head.

(2) Accident site and business development The operation site where the accident occurred is located in the middle of the south side of the TOD complex construction project site of Jinan West Passenger Station, North Lashanhe East Road, Jingshi Road, Huaiyin District, Jinan City.

(4) According to the requirements of the Measures for On-site Warning Education of Production Safety Accidents in Shandong Province (Trial), the on-site warning education meeting was held in Huaiyin District on May 24, 2022.

and Shandong Shunda Jiye Construction Engineering Co., Ltd.

signed the “Contract Agreement for the Commercial Land Foundation Treatment Project of the TOD Project of Jinan Longhu West Passenger Station”, in which the scope, mode and duration of the project were agreed.

493 of the State Council), the Regulations of Shandong Province on Work Safety and other relevant laws and regulations, and approved by the People’s Government of Huaiyin District, the District Emergency Management Bureau, the Huaiyin Branch of Jinan Public Security Bureau, the District Federation of Trade Unions, the District Market Supervision and Administration Bureau, the District Human Resources and Social Security Bureau The District Housing and Urban-Rural Development Bureau, Zhangzhuang Sub-district Office and other units sent personnel to the “Huaiyin District ‘5 · 20’ Shandong Shunda Jiye Construction Engineering Co., Ltd.

At 20:04, he died after rescue.
.

5), the accident investigation team and the Discipline Inspection Commission investigated the relevant personnel of Shandong Shunda Jiye Construction Engineering Co., Ltd.

had a lifting injury accident in the middle of the south side of the construction site of the TOD Complex of Jinan West Passenger Station, resulting in one death and a direct economic loss of more than 2.3 million yuan.

(5) According to the requirements of the “Four in One” Notice on Strengthening the Investigation and Handling of Accidents (Luan Ban Fa [2022] No.

The crane driver, Korea, lifted the conduit (iron, 0.25 m in diameter, 9 m in length and 200 kg in weight) from the southeast of the crane to the ground on the west side of the crane with the radius of the crane arm.

(3) Crane and driver: The truck crane has a dead weight of 25890 kg and a maximum lifting capacity of 20000 kg.

Yan Mouchao is collecting tools at the scene.

Construction unit: Shandong Shunda Jiye Construction Engineering Co., Ltd., unified social credit code: 91370103MA3MHYPU22; Type: limited liability company; Registered capital: twenty million yuan only; Registered address: Room 401, Floor 4, No.