The maximum reward for prefabricated buildings is 10 million! Beijing solicited the Detailed Rules for the Management and Implementation of


Fax: 010-55597142; 5.

E-mail: bjjwjnjcc@zjw.beijing.gov.cn ; 2.

(5) Green development demonstration projects identified by the state and the city that need key support and incentives.
.

According to the implementation of the building area, a municipal reward fund of no more than 200 yuan per square meter will be given, and the maximum reward for a single demonstration project will not exceed 6 million yuan.

(1) Energy conservation and green transformation project of public buildings.

Double Ended Ferrule

Annex: 1.

(2) Ultra-low energy consumption building.

Feedback channels are as follows: 1.

Projects declared before May 31 of the current year can be included in the scope of municipal incentive fund support of the current year, and projects declared after June 1 of the current year can be included in the scope of municipal incentive fund support of the next year.

The time for public consultation is from February 13 to February 20, 2023.

The total amount of municipal incentive funds for a single demonstration project will not exceed 30% of the transformation investment.

Please log in to the website of Beijing Municipal People’s Government( http://www.beijing.gov.cn )And put forward opinions and suggestions in the column of “Collection of Opinions on Policy Documents” under the section of “Interaction between Government and People”.

In order to further promote the green development of buildings in the city and standardize the management of municipal incentive fund demonstration projects for green development of buildings, according to the Beijing Measures for the Management of Incentive Fund for Green Development of Buildings (Beijing Finance and Economics Construction [2022] No.

Mailing address: Building Energy Conservation and Building Materials Management Office of Beijing Municipal Commission of Housing and Urban-Rural Development, No.

(3) Assembled buildings above AA level.

Tel: 010-5557922, 010-55598287; 4.

Article 2 The implementation rules are applicable to the application, review, performance evaluation, supervision and management of the demonstration project of the construction green development incentive fund in our city.

Projects that meet the national Green Building Evaluation Standard (GB/T50378), Green Industrial Building Evaluation Standard (GB/T50878), Beijing-Tianjin-Hebei Green Snow Sports Stadium Evaluation Standard (DB11/T1606) and have obtained the three-star green building logo and have been put into use for more than one year, or meet the national Green Reconstruction Evaluation Standard for Existing Buildings (GB/T51141) Beijing’s Evaluation Standard for Civilized Green Transformation of Existing Industrial Buildings (DB11/T1844) has won the green building identification project of more than two stars.

Projects that have passed the comprehensive acceptance of the District Housing and Urban-Rural (Municipal) Construction Commission will be given municipal incentive funds of no more than 20 yuan per square meter according to the approved incentive area.

The building area shall be more than 1000 square meters and the whole building shall be implemented, and the special acceptance of ultra-low energy consumption buildings shall be passed.

2185) and in combination with the actual situation of Beijing.

According to the implementation of the building area, a municipal reward fund of no more than 120 yuan per square meter will be given, and the maximum reward for a single demonstration project will not exceed 10 million yuan.

2185), The Municipal Commission of Housing and Urban-Rural Development and the Municipal Bureau of Finance jointly formulated the Detailed Rules for the Implementation of the Management of the Demonstration Project of Beijing Building Green Development Incentive Fund (for Trial Implementation) (Draft for Comments), which is now open to the public for comments and welcome suggestions from all walks of life.

11), Ultra-low energy consumption rural housing in line with the Technical Guidelines for Beijing Ultra-low Energy Consumption Rural Housing Demonstration Project.

9, Daji Street, Tongzhou District, Beijing (please indicate the words “comments collection” on the envelope); 3.

Including: urban residential buildings that conform to the Design Standard for Ultra-low Energy Consumption Residential Buildings (DB11/T1665), urban public buildings that conform to the Technical Guidelines for Beijing Ultra-low Energy Consumption Demonstration Projects or the design standard for Beijing Ultra-low Energy Consumption Public Buildings, and urban existing building renovation projects that conform to the Technical Essentials for Beijing Ultra-low Energy Consumption Demonstration Projects (Annex 1 of Beijing Construction Law [2017] No.

Projects that meet the requirements of the Notice on Printing and Distributing the Interim Measures for the Administration of Energy-Saving and Greening Renovation Projects and Incentive Funds of Public Buildings in Beijing (JJF [2017] No.

(4) High-star green buildings.

Chapter II Application for Demonstration Projects Article 3 The green development demonstration projects of buildings that meet the following conditions can apply to the housing and urban (municipal) construction commission of each district for municipal incentive funds, and apply for and accept them immediately.

12) and the energy saving rate requirements and are included in the management of energy consumption quota of public buildings in Beijing have been included in the management system of energy-saving and greening renovation projects of public buildings of the Municipal Housing and Urban-Rural Development Commission from January 1, 2019 to December 31, 2020 or completed the renovation after January 1, 2021.

According to the implementation of the building area, a municipal reward fund of no more than 60 yuan per square meter will be given, and the maximum reward for a single demonstration project will not exceed 6 million yuan.

Implementation Rules of Beijing Construction Green Development Incentive Fund Demonstration Project Management (Trial) (Draft) Beijing Housing and Urban-Rural Development Commission February 13, 2023 Beijing Construction Green Development Incentive Fund Demonstration Project Management Implementation Rules (Trial) (Draft) Article 1 of Chapter I General Provisions: In order to standardize the project management of Beijing’s incentive funds for green development of buildings (hereinafter referred to as “municipal incentive funds”), strengthen the project supervision and management and performance evaluation, these implementation rules are formulated in accordance with the relevant provisions of the Beijing Measures for the Administration of Incentive Funds for Green Development of Buildings (Beijing Finance and Economics Construction [2022] No.

Draft instructions for the Implementation Rules of Beijing Construction Green Development Incentive Fund Demonstration Project Management (Trial) (Draft) 2.

A prefabricated building project that meets the Beijing Standard for Evaluation of Prefabricated Buildings (DB11/T1831) and the assembly rate reaches AA (BJ) and AAA (BJ).

Tags:

Related Post