Jianjiantong media ID: jianzhong001 recently, it is a good time for the construction project department to carry out organizational adjustment, aiming at strengthening and improving the work of the project department in the next year
.
This paper is extracted from “Hunan Province construction project department and site supervision department key post staffing management method”, according to the scale of the project proposed post staffing standards, and summed up the job conditions and main responsibilities of each post personnel, which is very helpful for our construction project department and personnel assessment, staffing and management, it is worth your reference, You can use it in the New Year! Staffing standards for key positions note: 1
.
If the difference in building area is less than 10%, it can be implemented as low-grade, and the safety officer shall be implemented as required, and the staffing standards shall not be reduced
.
2
.
This standard is the minimum staffing standard for key positions
.
3
.
For complex sports venues, comprehensive projects and projects with tight construction period and multi shift operation, the number of constructors, quality officers and safety officers should be appropriately increased on the basis of the above allocation standards
.
Job requirements and main responsibilities of key post personnel: 1
.
Project leader [job requirements] (1) obtain corresponding constructor registration certificate; (2) obtain safety production assessment certificate of project leader issued by provincial housing and urban rural construction department
.
Main responsibilities: (1) preside over the work of the project management department, implement the construction project management on behalf of the enterprise, implement the national laws, regulations, guidelines, policies and mandatory standards, implement the management system of the enterprise, and safeguard the legitimate rights and interests of the enterprise; (2) implement the management objectives and specified tasks assigned by the enterprise to the project; (3) organize the preparation of the project management implementation plan and the implementation plan (4) optimize the allocation and dynamic management of construction personnel, construction machinery, construction materials and other production factors entering the site, and focus on the management of key post personnel and special operation personnel performing their duties; (5) establish the quality management system and safety system according to the “construction enterprise safety production evaluation standard” jcj / T77 and “construction safety inspection system” According to jcj / t59 and GB / t50430, organize and implement standardization work, conduct civilized construction management on site, discover and deal with emergencies; (6) implement quality and safety responsibility according to the notice of Ministry of housing and urban rural development on printing and distributing ten regulations on quality and safety responsibility of construction project manager (Trial Implementation)
.
(7) Be responsible for the coordination and process control with the enterprise management, labor operation level, all cooperating units, the employer, the subcontractor, the supervision engineer and the owner within the scope of authorization, and solve the problems in the construction process of the project; (8) participate in the project completion acceptance, prepare the settlement materials and analysis summary, and accept the audit; (9) deal with the aftercare work of the project department; (10) cooperate with the owner To assist enterprises in project inspection, appraisal and award application
.
2
.
Technical director of the project [qualifications] the technical director of the first-class project (according to the schedule 2 standard of “Regulations on management of qualification of engineering supervision enterprises”, the same below) shall have a college degree or above, a senior professional title suitable for the project, and more than 8 years of relevant professional and technical management
.
The project technical director of the second level project shall have a college degree or above, an intermediate professional title suitable for the project, and more than 5 years of relevant professional and technical management
.
The project technical director of the third level project shall have a technical secondary school degree or above, the professional title of assistant engineer corresponding to the project, and more than 5 years of relevant professional technical management
.
Other conditions determined by construction enterprises according to project scale, complexity and professional requirements
.
Main responsibilities: (1) preside over the technical management of the project; (2) preside over the formulation of the project technical management work plan; (3) inspect and receive the design drawings with the special seal for construction drawing review according to the regulations, participate in the drawing review and design disclosure, and confirm the results; (4) organize relevant personnel to be familiar with and review the drawings, and preside over the preparation of the construction scheme for the project management implementation plan (5) be responsible for technical disclosure; (6) be responsible for measurement and verification; (7) guide quality inspection and test; (8) specifically organize the preparation and approval of construction organization design, major hazard identification and control scheme, special construction scheme, review operation instruction and organize the implementation; if there are subcontractors, be responsible for supervising the implementation of corresponding work of subcontractors; (9) Participate in the project acceptance, deal with quality and safety issues; (10) organize the visa, collection, sorting and filing of various technical data; (11) organize technical learning and exchange of technical experience; (12) organize technical research
.
3
.
The construction worker [job requirements] has obtained the post qualification certificate of construction worker issued by the provincial housing and urban rural construction department
.
[Main Responsibilities] (1) organize construction in strict accordance with relevant national standards, specifications, procedures, construction organization design, key and special process operation instructions, design drawings, joint review minutes of drawings, design changes and technical verification; (2) organize relevant teams and groups to be familiar with construction drawings, and make technical, quality, key and special process and safety disclosure to team operators, According to the construction organization design, arrange the process overlap, make the process handover records, and strive to complete the image progress plan; (3) participate in the formulation of labor management plan, participate in the establishment of project labor management organization and labor management system, reasonably arrange the labor combination, timely make the project construction records, concealed project records and visa, and fill in the construction log day by day; (4) be responsible for or Supervise the entry and exit of labor service personnel and employment management, audit the identity and qualification of labor service personnel, participate in the signing of labor subcontract, and assess the on-site construction management of labor service team
.
Scientific arrangement of the supporting operations of various professions and the three-dimensional cross operation between various types of work; (5) responsible for the collection and collation of labor settlement data, and participate in the settlement of labor fees
.
Participate in or supervise the payment of labor wages, and be responsible for the publicity of labor wages and the establishment of accounts
.
Participate in the preparation and implementation of emergency plans for labor disputes, and participate in the mediation and handling of the aftermath of labor disputes and industrial accidents
.
(6) To be responsible for the compilation of management data of labor service team and labor service personnel
.
Responsible for collecting, sorting out and handing over the labor management data
.
(7) Do a good job in the construction site management and civilized construction, so that the site is clean and the materials are stacked orderly
.
4
.
Safety Officer [job requirements] obtain the safety production assessment certificate of full-time safety officer issued by provincial housing and urban rural construction department.
.