[IBE] Common Problems in Building Design: Electrical Engineering 20-21


Quality | There are toilets, bathrooms, etc.

located above the dispatch room and distribution room in the basement of the residential building.

A mezzanine is now set up, but the water supply and drainage, wastewater and sewage, and water supply pipelines all pass through this mezzanine and connect to the upper toilets and bathrooms.

Does this mezzanine need to be equipped with waterproofing, drainage measures, and sewage measures? Does Article 2.

0.

scaffolding clamp swivel type

3, Paragraph 1 and its interpretation of the General Code for Electrical and Intelligent Construction GB 55024-2022 apply to this situation?.

Tags:

Related Post

[job search] 10 real estate / construction / consulting enterprises recruit Project Manager / Business Manager / Cost Manager / Supervisor /[job search] 10 real estate / construction / consulting enterprises recruit Project Manager / Business Manager / Cost Manager / Supervisor /

Gao: 13246413216 (same wechat number) Mr. The specific salary depends on personal experience and ability; 2. 2. Paid annual leave, family visit leave and other national statutory holidays, free collective