In the early stage of hydraulic engineering hub building design, the first step is to place various buildings in appropriate locations based on terrain and geological conditions, and determine the size of the space they occupy according to functional needs.
Secondly, according to the requirements of the regulations, there should be a certain safe distance between them.
After determining the layout plan, proceed with the detailed design of each building.
This design approach is consistent with top-down skeleton design, therefore, using skeleton design is very in line with the design habits of designers.
.