National Day Special 3 (Water Supply and Drainage) Detailed Explanation of the Design Steps for High rise Building Water Supply and Drainage


1.

lifting socket withhold rebar

Determine the inlet point of building water supply (usually two-point inlet) and control method [usually two valves (one gate valve and one check valve each) and one table];.

Tags:

Related Post

Lize “underground city” approved! The total underground building scale is about 500000 square meters! The total investment exceeds 7.1Lize “underground city” approved! The total underground building scale is about 500000 square meters! The total investment exceeds 7.1

Recently, the Fengtai District government website released the reply to the proposal for underground infrastructure and comprehensive development supporting projects in the North District of Beijing Lize financial and business

Recruitment announcement of Shaanxi corps of China Building Materials Industrial Geological Exploration Center in 2022 (40 people)Recruitment announcement of Shaanxi corps of China Building Materials Industrial Geological Exploration Center in 2022 (40 people)

Have physical conditions suitable for job requirements;   4. Xi’an building materials Geological Engineering Survey Institute Co., Ltd., established in 1990, is an engineering survey and design unit with more than