Facing “Uncertainty” with “Uncertainty” – “the Taihu Lake Cloud Valley” Digital Industrial Park of Suzhou High tech Zone/Jiucheng Urban


The design adopts a diffuse multi-level public space.

The first level is the clearly defined shared space in the middle section, the second level is the open space connected to the outdoor space on the first floor, and the third level is the rooftop space open on the second floor.

In addition, the most important thing is that various possibilities for public space have been reserved in different standard layers.

flat steel lifting socket

.

Tags:

Related Post

Construction Engineering Urgent Recruitment, Construction Engineering Group (Joined Directly in One Second), Summary of Today’s ConstructionConstruction Engineering Urgent Recruitment, Construction Engineering Group (Joined Directly in One Second), Summary of Today’s Construction

Recruitment: 200 nursing professionals, Top job recruitment: Rehabilitation technology major 300 people recruitment: Catering 100 people recruitment: Telephone customer service 150 people recruitment: Computer major 150 people recruitment: Medical beauty