Prefabricated buildings are unstoppable, and the latest supporting policies and subsidy standards of 23 provinces in China are summarized


Beijing’s target: by 2018, the proportion of prefabricated buildings in the new building area will reach more than 20%, and by 2020, the proportion of prefabricated buildings in the new building area will reach more than 30%

.

Subsidy: for the non-governmental investment projects with prefabrication rate of more than 50% and assembly rate of more than 70% within the scope of implementation, a financial reward will be given; for the non-governmental investment projects not within the scope of implementation, those who voluntarily adopt prefabricated buildings and meet the implementation standards will be given a certain proportion of financial reward according to the incremental cost, and at the same time, an area reward of no more than 3% will be given; value-added The tax will be refunded immediately

.

All the three types of projects are prefabricated buildings: first, Beijing affordable housing and new buildings invested by the government

.

The second is to obtain the commercial housing development projects with the above ground building scale of more than 50000 square meters (including) of state-owned land use right in the Sixth District of the city and Tongzhou District by means of bidding, auction and listing

.

Third, commercial housing development projects with the above ground construction scale of 100000 square meters (including) or more state-owned land use rights in other areas

.

Photo objective of Shanghai: to implement “two mandatory ratios” (prefabricated building area ratio and prefabricated assembly rate of new prefabricated building monomer project) from the source of land, that is, in 2015, the proportion of prefabricated building area in the total land supply area will not be less than 50%; in 2016, prefabricated building will be adopted for all qualified new civil buildings within the outer ring road, and the outer ring road will be more than 50% More than 50% outside the outer ring; since 2017, the number outside the outer ring has increased year by year on the basis of 50%

.

Subsidies: for prefabricated residential projects with a total construction area of more than 30000 square meters and a prefabricated assembly rate of 45% or more, the subsidy is 100 yuan per square meter, and the maximum subsidy for a single project is 10 million yuan; for projects that voluntarily implement prefabricated buildings, the floor area ratio award is no more than 3%; for prefabricated buildings with prefabricated sandwich insulation walls, the floor area ratio award is no more than 3% Li

.

Jiangsu province goal: by 2020, the proportion of prefabricated buildings in new buildings will reach more than 30%

.

Subsidy: the project construction unit can apply for demonstration projects, including residential buildings, public buildings and municipal infrastructure

.

The subsidy amount of each demonstration project is about 1.5-2.5 million yuan

.

The project construction unit can apply for affordable housing projects, which are constructed according to the modern way of the construction industry

.

The prefabricated assembly rate of single concrete structure buildings is not less than 40%, and the prefabricated assembly rate of steel structure and wood structure buildings is not less than 40% The production and assembly rate shall not be less than 50%, and the reward shall be 300 yuan per square meter of construction area, and the maximum subsidy for a single project shall not exceed 18 million yuan per unit

.

The goal of Guangdong Province: by 2020, prefabricated buildings will account for 15% of new buildings

.

Among them, prefabricated buildings in the Pearl River Delta urban agglomeration account for more than 15% of the newly built building area, the proportion of prefecture level downtown areas in the East and northwest of Guangdong with a permanent resident population of more than 3 million accounts for more than 15%, and the proportion of other areas in the Province accounts for more than 10%; by 2025, prefabricated buildings in the Pearl River Delta urban agglomeration account for more than 35% of the newly built building area, and the proportion of the East and northwest of Guangdong with a permanent resident population of more than 3 million accounts for more than 3 million More than 30% of the city centers are in prefecture level cities, and more than 20% in other areas of the province

.

Subsidies: in the city’s building energy efficiency development funds, it focuses on supporting prefabricated buildings and BIM applications, and grants are given to those identified as qualified, with the maximum amount of single subsidy exceeding 2 million yuan

.

Zhejiang province goal: by 2020, the proportion of prefabricated buildings in new buildings in Zhejiang Province will reach 30%

.

Subsidy: the maximum amount of housing provident fund loan can be increased by 20% when purchasing prefabricated commercial housing with housing provident fund loan; for prefabricated construction projects, the quality deposit paid by construction enterprises is calculated based on the total contract price deducting the total price of prefabricated components multiplied by 2% rate, and the residential property warranty paid by construction units is calculated based on the total cost of property construction and installation deducting the total cost of prefabricated components Price as the base multiplied by 2% rate; plot ratio reward, etc

.

All class 1 projects adopt prefabricated construction: from October 1, 2016, all newly-built houses on the land transferred or allocated in the central urban areas of cities and counties in the province will be fully decorated and finished products delivered

.

The goal of Hubei Province: by 2020, the proportion of prefabricated building area in newly built building area in Wuhan will reach more than 35%, that in Xiangyang, Yichang and Jingmen will reach more than 20%, and that in other cities divided into districts, Enshi, Zhiguan and Shennongjia will reach more than 15%

.

By 2025, prefabricated buildings will account for more than 30% of the new construction area in the province

.

Two types of projects are all prefabricated buildings: first, since July 1, 2017, the whole decoration of prefabricated buildings has been implemented in the new public rental housing in the province

.

Second, by 2020, the newly-built houses in Wuhan, Xiangyang, Yichang and Jingmen will be fully decorated

.

Shandong Province’s goal: by 2017, the proportion of prefabricated building area in the new building area will reach about 10%; by 2020, the proportion of prefabricated buildings in Jinan and Qingdao will reach more than 30%, and that in other cities divided into districts and counties (cities) will reach more than 25% and 15% respectively; by 2025, the proportion of prefabricated buildings in the new building area will reach more than 40%

.

Subsidies: preferential financial policies for home buyers; plot ratio reward; the value of prefabricated components can be deducted from the quality deposit project, and the wages of migrant workers and the performance bond can be reduced by half

.

The two types of projects are all prefabricated buildings: first, new public rental housing, shantytown reconstruction and resettlement housing projects in the province’s urban planning areas; second, government investment projects

.

The goal of Hunan Province: by 2020, the proportion of prefabricated buildings in the central cities of cities and prefectures in the province will reach more than 30%

.

Subsidy: financial reward; included in the green channel of project approval; plot ratio reward; preferential tax; priority for pre-sale of commercial housing; optimization of project bidding procedures, etc

.

All the three types of projects adopt prefabricated buildings: first, newly built affordable housing, schools, hospitals, scientific research, office buildings, hotels, complex buildings, industrial plants, etc

.

invested by the government; second, municipal public facilities such as urban subway segments, underground utility corridors, urban roads and auxiliary facilities for landscaping, etc

.

suitable for factory prefabrication; third, within the second ring road of Changsha City It is suitable for prefabricated construction projects invested by social capital in Changsha high tech Zone, Changsha Economic Development Zone and other central cities

.

The goal of Sichuan Province: by 2020, prefabricated buildings will account for 30% of the new buildings, the assembly rate will reach more than 30%, and the full decoration of new houses will reach 50%; by 2025, the buildings with assembly rate of more than 50% will account for 40% of the new buildings, and the full decoration of new houses will reach 70%

.

Subsidies: give priority to land use indicators; arrange scientific research funds; reduce the payment of enterprise income tax; plot ratio reward, etc

.

Class 1 projects all adopt prefabricated construction: in the construction of bridges, railways, roads, utility corridors, tunnels, municipal engineering, all adopt prefabricated construction except cast-in-place

.

The goal of Hebei Province: by 2020, the proportion of prefabricated buildings in the new construction area will reach more than 20%; by 2025, the proportion of prefabricated buildings in the new construction area will reach more than 30%

.

Subsidies: priority to guarantee land use; plot ratio reward; refund of wall reform fund and bulk cement fund; 50% VAT refund immediately

.

Class 1 projects are all prefabricated buildings: since 2017, public buildings invested by the government, such as hospitals, homes for the aged, schools, kindergartens and venues, have been prefabricated buildings in principle.

.

Tags:

Related Post