Source: the copyright of fire engineering belongs to the original author
.
1
.
Civil engineering part: ① the civil engineering part is completed according to the design and construction approved by the public security fire department; ② the important or dangerous room walls such as firewall, walkway, room partition wall, stairwell, front room, fire center, fire pump room and electrical room have been built to the structural floor; ③ each floor or every 2-3 floors of cable and pipe well Non combustible materials equivalent to the fire resistance limit of the floor are used to close the place where the fire door passes through the floor; the pores formed at the place where the cables and pipelines pass through the wall and the floor have been closed tightly; the installation and commissioning of the door closer of the fire door have been completed; the surrounding fire passage has been unblocked
.
2
.
Outdoor fire water supply: ① the fire water supply system of the building has been connected with the municipal water supply network according to the design; ② the outdoor fire hydrant and pump adapter have been installed and opened
.
The connector with different functions should be marked clearly
.
3
.
Fire extinguishing system: ① the fixed system has been installed and debugged according to the design; the debugging report has been made; ② the water hose, water gun and water pipe in the fire hydrant box have been fully equipped, and the placement and connection of the water hose interface can meet the use requirements; ③ the power supply of the fire pump and the self cutting of the main and standby pumps have been in place; ④ the color code of the system has been implemented; ⑤ the automatic water extinguishing system has been tested by professional institutions, and all technical requirements have been improved The indicators meet the requirements of the specification; 6
.
Fire extinguisher has been equipped according to the requirements of the specification
.
4
.
Automatic fire alarm system: ① the system has been installed and debugged according to the design; the debugging report has been made; ② the fire center has the function of directly forcing on and off the fire pump and smoke exhaust fan; ③ the alarm, linkage control, emergency broadcast, fire communication and other functions of the system have been tested by the professional organization, and all meet the specification requirements
.
5
.
Fire power supply: ① the fire power supply of important equipment has been connected according to the design, and the two-way power supply can be automatically switched at the end control box of fire pump, smoke control fan, fire elevator, emergency lighting and other fire power equipment
.
The emergency generator has been debugged and put into operation; ② emergency exit and evacuation indicator lights are installed in the emergency exit and aisle according to the regulations, and the power supply has been connected and put into normal use
.
6
.
The smoke control system (1) has been installed and debugged according to the design; (2) the wind speed, wind pressure and smoke exhaust volume have reached the design index through professional testing institutions
.
7
.
Safety management: ① the fire safety organization and automatic fire system operators have been implemented and trained with certificates; ② the fire safety management system and emergency plan have been formulated
.
80% fill in the following information will help us to improve your products and services
.
We recommend you to obtain more 10W + dry goods information
.
We compile, organize and archive the pre construction information, the whole process of selling out of stock construction information, the complete collection of inspection application information, and the most beautiful information clerk
.
You can also contact us through the following ways: www.zhuyew.cn Zhuye Mall: shop.zhuyew.cn Zhuye Society District: http://sq.zhuyew.cn/ Jitter / Tencent video / Youku potatoes: tiktok software headlines today: micro-blog 400-163-8866: Himalaya software: 24 hours of sales and service hotline:
.