[job search platform] 4-19 job search information of construction site!


Recruitment Information Jilin Changchun Security Engineering 1

.

Recruitment type: security engineering slope protection / slope 2

.

Project address: Changchun City, Jilin Province 3

.

Project Description: river slope protection construction, dry check stone, hook machine to transport stone in place, can move, normal physical strength can do at least 5 cubic meters per day, physical strength is good, can do more than 7-9 cubic meters, 80 yuan per cubic meter, 1 m × 2 m × 0.4 m cage

.

Need a team of 20 people, with a hook machine, 4

.

Project picture: 5

.

Contact name: Laosi 6

.

Contact mobile phone: 13019290105 Click

.

Tags:

Related Post