[convenience] Ganyu district has set up a temporary construction waste dump (point) to protect the ecological environment of the area under its jurisdiction!


After the completion of the project, it will effectively alleviate the reuse of construction waste resources in urban areas and even 15 townships

.

It is hereby announced

.

They shall not be discarded, leaked or scattered along the way

.

One on the east side of houchenzhuang public toilet (located in Houchen community in the north section of Xinjian Road), one on Zhenhai South Road (located 100 meters away from Henan Community Service Center) and three on the East embankment of Shuiman bridge (located 200 meters away from the north bridge head of Shuiman bridge)

.

4、 All construction wastes must be cleared and transported in a timely manner and transported in a closed manner

.

5、 From the date of promulgation of this announcement, any unit or individual who dumps, scatters or piles construction waste at will, mixes domestic waste with construction waste, mixes hazardous waste with construction waste, and sets up a dump to receive construction waste without authorization, Ganyu District Comprehensive Administrative Law Enforcement Bureau will be severely punished in accordance with the provisions on the management of urban construction waste and other relevant provisions of the Ministry of housing and urban rural development

.

The disposal unit shall apply to the District Government Affairs Service Center (the service window of the Urban Management Bureau) and dispose of the urban construction waste only after obtaining the approval for the disposal of urban construction waste

.

Among them, 300000 tons of demolition waste, 30000 tons of engineering waste (waste cement blocks, etc.), 150000 tons of decoration waste and 20000 tons of sorting waste

.

At present, the pilot of Guanlan Shangcheng community has been completed

.

Therefore, in the context of the needs of enterprises and residents, it is very necessary to set up special temporary stacking yards (points) for construction waste

.

Relevant projects will also be built in Ganyu in the future

.

In the next step, combined with the reuse of waste resources, turning waste into treasure can be described as killing multiple birds with one stone!    ▼ for more wonderful recommendations, please pay attention to us ▼ give the time to reading source: Lianyungang ghost.

.

The site selection of construction waste resource reuse project has been completed and is being actively promoted

.

In addition, in the next step, 20 temporary stacking sites will be set up in the community

.

Everyday, we often see construction waste in the community or on the roadside

.

Remind again: please put small decoration construction waste into bags for your convenience

.

Some are mixed with domestic waste and thrown near the garbage can, and some are dumped on the side of the road or ditches at night

.

The announcement on the establishment of temporary stacking sites (sites) for construction waste in Ganyu District aims to further strengthen the management of construction waste in the urban area, eliminate the phenomenon of “random pulling and dumping” of construction waste, completely change the current situation and extensive treatment method of stacking and landfilling construction waste everywhere, and effectively avoid the pollution of land, air and water sources caused by disorderly disposal, According to the regulations on the management of urban construction waste, the regulations of Jiangsu Province on the management of urban appearance and environmental sanitation and the regulations of Lianyungang City on the management of urban appearance and environmental sanitation issued by the Ministry of housing and urban rural development, Ganyu District Urban Management Bureau has set up 9 temporary stacking yards (points) of construction waste in the urban area, which are hereby announced as follows:   1、 One temporary stacking yard for construction waste of the project (with a site area of 200 mu), located 300 meters east of g228, Qingkou Town, is used for temporary stacking of spoil, waste materials, etc

.

The total annual waste disposal scale is 500000 tons

.

Ganyu district has made beneficial exploration and set up temporary stacking yards (points) for construction waste

.

It is used to temporarily stack the spoil and waste materials produced by the construction unit and the construction unit in the process of new construction, reconstruction, expansion and demolition of various buildings, structures and pipe networks

.

If the disposal site is not found to receive the construction waste, it shall be dumped here

.

The prospect of a construction waste resource reuse enterprise in Nantong is attached

.

On June 1, 2021, Ganyu District Urban Administration Bureau of Lianyungang City has set up 8 temporary stacking sites for decoration and construction waste in Ganyu, of which several real photos are presented for easy use

.

  3、 The property management community must set up temporary stacking points for large and decoration waste, with an area of ≥ 20 square meters, a closed hard enclosure with a height of not less than 2 meters, and a switchable gate

.

The entrances and exits and access channels shall be hardened, equipped with lighting and fire-fighting equipment, and flushing equipment and movable dust-proof devices can be set if possible

.

Ganyu district construction waste resource reuse project is planned to be constructed

.

Ganyu district construction waste resource reuse project is planned to be located in Liuliqiao area, Qingkou Town, with a total investment of about 80 million yuan and an area of about 85 mu (including about 5 mu of land for recyclable and large waste sorting center)

.

The temporary stacking site of decoration waste shall be bagged, and the signboard of “temporary stacking site of large and decoration waste” shall be set in an eye-catching position, indicating the opening time, supervision and reporting, collection and transportation contact information, etc., which shall be collected and managed by a special person arranged by the property company

.

generated during the construction, reconstruction, expansion and demolition of various buildings, structures and pipe networks by the construction unit and the construction unit

.

How to deal with it has become a thorny problem

.

With the rapid development of urban construction, construction waste is increasing year by year

. Fixing Socket Angular End

It not only hinders the view, but also destroys the ecological environment

.

The wheels shall not travel with mud to pollute the road

.

It is worth noting that individual citizens directly dump construction waste at temporary sites, which is a wrong way of putting it, causing great trouble for relevant departments to clean up, A forklift needs to be dispatched for cleaning

.

If bagging cannot be carried out due to large quantity, residue transportation enterprises with corresponding qualifications shall be selected for transportation, which must be uniformly transported to the temporary stacking point of Yitang Road (the southeast corner of Zhenhai road and Yitang Road)

.

Brief introduction to Ganyu temporary construction waste dump this temporary construction waste dump is invested, constructed and operated by suhai group

.

It is located 300 meters east of g228, Qingkou Town, with a site area of 200 mu

.

It is used for the waste soil, waste materials and other wastes (excluding waste plastics, waste metals, waste bamboo and wood, etc.) generated in the process of decoration and decoration of houses such as residents and offices, and the construction waste for decoration and decoration is bagged

.

2、 There are 8 temporary stacking sites for decoration construction waste, including 1 Yitang Road (with a site area of 3 mu, located at the southeast corner of Zhenhai road and Yitang Road); One in the east of houchenzhuang public toilet (located in Houchen community, Xinjian North Road); 1 north entrance of Jinling Road (200m north of district urban management brigade); 3 North East River Embankments of shuimanqiao (200m from north to east of shuimanqiao); 1 North Yitang Road (100 meters north of Xuefu Mingyuan community); 1 Zhenhai South Road (located 100m south of Henan Community Service Center)

.

Tags:

Related Post