Mulan County construction safety and licensing agency


   How to speed up the approval progress of engineering construction projects? How to reduce the approval time of the whole process to less than 100 days?   Yesterday, Hangzhou engineering construction project approval management system was officially put into operation.

In the past, the construction drawings of a project needed to be approved one by one by the fire control, civil air defense and construction commission.

Planned cities: Beijing (Beijing), Tianjin (Tianjin), Heilongjiang (HEI), Jilin (Ji), Liaoning (Liao), Hebei (Ji), Henan (Yu) and Shandong (Lu) , Shanxi (Jin), Shaanxi (Shan), Inner Mongolia (Inner Mongolia), Ningxia (ning), Gansu (long, GaN), Xinjiang (Xin), Qinghai (Qing).

(www.zhaocaimao8.

The system integrates the big data of more than 30 units and departments related to construction approval, including design scheme review joint review subsystem, construction drawing joint review subsystem, construction permit joint review subsystem and completion test integrated subsystem.

  “Take the construction drawing review as an example.

Zhaocaimao headquarters is located in Chengdu, Sichuan, a “Little Hong Kong” in Southwest China, enjoying a “land of abundance” Laudatory name.

At present, there are more than 500 employees, the proportion of professional and technical personnel is more than 60%, and the number of registered technical talents with medium and high-grade technical titles and more than class I qualifications ranks in the forefront of the operation.

“Through system data sharing and exchange, enterprises can avoid submitting data from multiple heads, realize unified acceptance, parallel approval, real-time circulation, tracking and supervision, and information sharing, further facilitate the work of the masses and enterprises, and improve the approval efficiency of engineering construction projects.”   Taking the project construction permit stage as an example, after the construction unit submits the application information, the project scheme design review, preliminary design review, civil building energy conservation review, wartime function and protection grade determination of new air defense basement, special review of seismic fortification of super high-rise building engineering, approval of water and soil conservation scheme of production and construction project, approval of environmental impact assessment documents of construction project, etc Each item shall be approved by each department in parallel.

service guide.

During the approval process, the system shall be interconnected with the license database, extract the license information in real time and directly push the approval documents.

  “Relying on the platform advantages of Zhejiang government affairs service network and the information advantages of the municipal data resources bureau, the system divides the approval process into four stages: project land planning permit, project construction permit, construction permit and completion acceptance.

The processing process shall be recorded in the form of time axis, marked in the whole process and supervised in real time.

The approval items in each stage are reported at one time and handled in linkage.” the relevant person in charge of the Municipal Construction Commission introduced the pilot reform of the approval system of engineering construction projects in Hangzhou “One blueprint” has been basically constructed.

With more than 10 years of intensive cultivation, our business has covered the whole southwest region and promoted to the whole country.

Professional contracting qualification for construction: Environmental protection, decoration, electromechanical equipment, building curtain wall, ancient architecture and city And road lighting, electronics and intelligence, fire protection, waterproof, anti-corrosion and thermal insulation, steel structure, formwork and scaffold, foundation, lifting equipment, ready mixed concrete, bridge, tunnel, highway pavement, highway subgrade, highway transportation, railway electricity, railway track laying and girder erection, railway electrification, airport runway, civil aviation air traffic control, airport visual navigation aid, port and coast, waterway Navigable buildings, port and shipping equipment and water traffic management, hydraulic metal structure fabrication and equipment, water conservancy and hydropower electromechanical equipment, river and lake regulation, power transmission and transformation, nuclear engineering, offshore oil and special services.

Tibet (Tibet), Hubei (Hubei), Anhui (Anhui), Jiangsu (Jiangsu), Shanghai (Shanghai), Zhejiang (Zhejiang), Fujian (min), Hunan (Hunan), Jiangxi (GAN), Sichuan (Sichuan, Shu), Chongqing (Chongqing) , Guizhou (Guizhou, Guizhou), Yunnan (Yunnan, Yunnan), Guangdong (Guangdong), Guangxi (Guangxi), Hainan (Hainan), Hong Kong (Hong Kong), Macao (Macao), Taiwan (Taiwan).

It is a company approved and registered by the Administration for Industry and commerce, providing qualification, qualification handling, qualification agency, qualification transfer of various construction engineering qualifications, handling safety production licenses and providing talent services for construction enterprises (class I and class II constructor, middle and senior engineer, technician certificate, etc.) Enterprise management consulting company, providing efficient resource services for enterprise development.

General contracting qualification for construction: construction, municipal administration, electric power, electromechanical equipment, highway, railway, port and waterway, water conservancy and hydropower, mining, metallurgical quality, chemical petroleum and communication.

This marks that as one of the important contents of the “five ones” project of the pilot reform of the approval system, the top priority of deepening the “run once at most” and promoting the reform of “release management service”, and the pilot reform of Hangzhou engineering construction approval system has entered a new stage.

Com) is referred to as zhaocaimao.

Formwork Wing Nut

We started in Chengdu and took Shu as the mainland.

Now, through the reform, the joint review of multiple departments and centralized drawing review have been realized.

  In addition, in the joint review of engineering design scheme drawings, driven by drawing collection, the land red line map, design scheme drawing, construction drawing, as built mapping drawing and other data are collected in one network to form a complete set of engineering construction project drawings and files, so as to meet the needs of quality and safety management in the whole life cycle of the project.

Tel: 13881983131 zhaocaimao construction wechat: 13881983131 Guangdong zhaocaimao Construction Engineering Consulting Co., Ltd.

provides you with the latest construction information.

  Zhaocaimao enterprise processing consulting (Sichuan) Co., Ltd.

Originally, it took at least 3 months to review, but now the preliminary review has been reduced to 12 working days.” the municipal construction commission “runs once at most” The relevant person in charge of the reform office also revealed that the current approval plan for general investment projects involving real estate and industrial enterprises, “in the future, the whole process approval time for general investment projects will be reduced to less than 100 days.”   Next, according to the system operation, the municipal construction commission will continue to improve and optimize the system functions, strengthen training, promote system application, actively help the pilot reform of engineering construction project approval, promote the digital transformation of the government for Hangzhou, and build a mobile service city with the least approval links, the highest efficiency and the best investment environment..

I.

Tags:

Related Post