The “intelligent building integrated management platform” project completed by Tianzhu Technology Co., Ltd. passed the evaluation of


To sum up, the research results of the project have reached the domestic advanced level.

The evaluation data provided are complete and meet the evaluation requirements.

Based on the technologies of real-time management of memory database, streaming media video transcoding, large-scale data storage and calculation, an intelligent building integrated management platform is developed to realize the functions of building automation, access control management, video monitoring, intelligent lighting, intrusion alarm, parking management and so on.

4.

3.

2.

After questioning and discussion, the evaluation conclusions are as follows: 1.

Suggestion: further integrate with digital twin technology and expand platform application…

The platform supports a variety of standard protocol interfaces (OPC, ODBC, LonWorks, BACnet, WebServices, etc.), with good compatibility and scalability.

The expert group listened to the report of the project team and reviewed the evaluation data.

Lifting Clutches

The platform is innovative in the simulation method based on preset communication protocol, cross subsystem information linkage control and analysis expression.

Members of the evaluation committee include Li Haiyu, a professor level senior engineer of Zhengzhou University comprehensive design and Research Institute Co., Ltd., Li Hongwei, a professor of space-time big data Institute of Zhengzhou University, Lei Ting, a professor level senior engineer of Zhengzhou first Construction Group Co., Ltd., Chen Chunxia, a senior engineer of Henan Information Center, Wang Qiqing, a professor level senior engineer of Henan architectural design and Research Institute Co., Ltd, Zhang Feng, professor level senior engineer of the Institute of combustion and heat of Zhengzhou Municipal Academy, and Wang Zili, professor level senior engineer of Henan metallurgical planning, design and Research Institute.

On September 29, 2021, Henan Green Construction Technology Center organized experts to evaluate the scientific and technological achievements of the “intelligent building integrated management platform” project completed by Tianzhu Technology Co., Ltd.