The main contents of the amendment include the following five aspects: 1.
Professional contracting qualification for construction: Environmental protection, decoration, electromechanical equipment, building curtain wall, ancient architecture and city And road lighting, electronics and intelligence, fire protection, waterproof, anti-corrosion and thermal insulation, steel structure, formwork and scaffold, foundation, lifting equipment, ready mixed concrete, bridge, tunnel, highway pavement, highway subgrade, highway transportation, railway electricity, railway track laying and girder erection, railway electrification, airport runway, civil aviation air traffic control, airport visual navigation aid, port and coast, waterway Navigable buildings, port and shipping equipment and water traffic management, hydraulic metal structure fabrication and equipment, water conservancy and hydropower electromechanical equipment, river and lake regulation, power transmission and transformation, nuclear engineering, offshore oil and special services.
3.
It is a company approved and registered by the Administration for Industry and commerce, providing qualification, qualification handling, qualification agency, qualification transfer of various construction engineering qualifications, handling safety production licenses and providing talent services for construction enterprises (class I and class II constructor, middle and senior engineer, technician certificate, etc.) Enterprise management consulting company, providing efficient resource services for enterprise development.
I.
Tel: 13881983131 zhaocaimao construction wechat: 13881983131 Henan zhaocaimao Construction Engineering Consulting Co., Ltd.
provides you with all-round supply: the latest construction information.
When the design scheme of ancillary greening projects of engineering construction projects is examined and approved in accordance with the capital construction procedures, the competent administrative department of urban greening of the urban people’s government must participate in the examination.
Planned cities: Beijing (Beijing), Tianjin (Tianjin), Heilongjiang (HEI), Jilin (Ji), Liaoning (Liao), Hebei (Ji), Henan (Yu) and Shandong (Lu) , Shanxi (Jin), Shaanxi (Shan), Inner Mongolia (Inner Mongolia), Ningxia (ning), Gansu (long, GaN), Xinjiang (Xin), Qinghai (Qing).
In terms of strengthening follow-up supervision, the supervision of relevant departments on relevant activities after the cancellation of administrative approval projects was strengthened.
Article 8 to apply for the qualification for foreign contracted projects, the following conditions shall be met: (1) With the status of a legal person, an engineering construction unit shall also obtain the special grade or class I (Class A) qualification certificate issued by the competent construction department or other relevant departments according to law; (2) have funds and professional technicians suitable for carrying out foreign contracted projects, and at least two of the management personnel have more than two years of experience in foreign contracted projects; (3) Having the ability of safety prevention suitable for carrying out foreign contracted projects; (4) having rules and regulations to ensure project quality and safe production, and having no major project quality problems or production safety accidents above major accidents in the last two years; (5) It has a good business reputation and has no major breach of contract or major illegal business records in the past three years.
General contracting qualification for construction: construction, municipal administration, electric power, electromechanical equipment, highway, railway, port and waterway, water conservancy and hydropower, mining, metallurgical quality, chemical petroleum and communication.
4.
At present, there are more than 500 employees, the proportion of professional and technical personnel is more than 60%, and the number of registered technical talents with medium and high-grade technical titles and more than class I qualifications ranks in the forefront of the operation.
With more than 10 years of intensive cultivation, our business has covered the whole southwest region and promoted to the whole country.
In terms of the reform of pre-approval of enterprise investment project approval, By modifying seven provisions of five administrative regulations including the regulations on energy conservation of public institutions, the pre-approval of nine enterprise investment projects such as energy conservation evaluation and review of construction projects was changed to be handled in parallel with project approval.
The competent department of commerce under the State Council or the competent department of Commerce of the people’s Government of the province, autonomous region or municipality directly under the central government shall Within 30 days from the date of receiving the application and supporting materials, it shall examine it together with the competent construction department at the same level and make a decision on approval or disapproval..
Article 16 the construction of urban greening projects shall be entrusted with holding corresponding funds Article 26 is changed into Article 25 and is amended as follows: “If the design scheme of the ancillary greening project of the engineering construction project is not approved or the construction is not carried out in accordance with the approved design scheme, the competent administrative department of urban greening of the urban people’s Government shall order it to stop the construction, make corrections within a time limit or take other remedial measures.” Article 26 If the design scheme of the ancillary greening works of the engineering construction project or the design scheme of the urban public green space, residential green space, scenic forest land, trunk road green belt and other greening works is not approved or constructed in accordance with the approved design scheme, the competent administrative department of urban greening of the urban people’s Government shall order the construction to stop, make corrections within a time limit or take other remedies 2.
service guide.
We started in Chengdu and took Shu as the mainland.
regulations on urban greening Delete Article 11, paragraph 3, and Article 16 Article 11 the design of urban greening projects shall be entrusted to design units with corresponding qualification certificates.
Com) is referred to as zhaocaimao.
If the design scheme really needs to be changed, it must be examined and approved by the original approval authority.
Tibet (Tibet), Hubei (Hubei), Anhui (Anhui), Jiangsu (Jiangsu), Shanghai (Shanghai), Zhejiang (Zhejiang), Fujian (min), Hunan (Hunan), Jiangxi (GAN), Sichuan (Sichuan, Shu), Chongqing (Chongqing) , Guizhou (Guizhou, Guizhou), Yunnan (Yunnan, Yunnan), Guangdong (Guangdong), Guangxi (Guangxi), Hainan (Hainan), Hong Kong (Hong Kong), Macao (Macao) and Taiwan (Taiwan).
(www.zhaocaimao8.
I.
5.
Zhaocai cat headquarters is located in Chengdu, Sichuan, a “small Hong Kong” in Southwest China, enjoying the “land of abundance” Laudatory name.
Article 7 units that contract foreign projects shall obtain the qualification for foreign contracted projects in accordance with the provisions of these regulations.
The second paragraph of Article 10 of the regulations on the administration of urban roads is revised to read: “if a unit invests in the construction of urban roads, it shall comply with the urban road development plan.” (Article 10…
Article 9 central enterprises and other units under the central administration (hereinafter referred to as central units) apply for the qualification of foreign contracted projects An application shall be submitted to the competent department of commerce under the State Council, and a unit other than the central unit shall submit an application to the competent department of Commerce of the people’s Government of the province, autonomous region or municipality directly under the central government where it is located; when applying, an application and supporting materials meeting the conditions specified in Article 8 of these Regulations shall be submitted.
Zhaocai cat enterprise processing consulting (Sichuan) Co., Ltd.
In terms of the cancellation of professional qualifications, 10 professional qualifications such as the practice qualification of the tenderee have been cancelled by modifying 27 provisions of 10 administrative regulations such as the implementation regulations of the bidding law.
The construction unit must carry out the construction in accordance with the approved design scheme.
2.
In terms of canceling service items in administrative approval, 2 administrative laws such as the regulations on the administration of seismic safety evaluation were amended The four provisions of the regulations have abolished and standardized two administrative examination and approval intermediary services such as seismic safety evaluation of construction sites.
If a unit invests in the construction of urban roads, it shall comply with the urban road development plan and be approved by the administrative department of municipal engineering.) 3 Chapter II of the regulations on the administration of foreign contracted projects is deleted.
In terms of canceling administrative approval items, 34 approval items such as radioactive drug business approval were cancelled by modifying 68 provisions of 22 administrative regulations such as the measures for the administration of radioactive drugs.
The greening of urban public green space, residential green space, scenic forest land and trunk roads The design scheme of the belt and other greening projects must be submitted to the urban greening administrative department of the urban people’s government or its superior administrative department for examination and approval in accordance with the provisions.