Who says illegal buildings must be demolished? These illegal buildings can not be demolished, depending on your situation?


(2) Failing to obtain a planning permit for a construction project, or failing to carry out construction in accordance with the approved scope and contents despite obtaining a planning permit for a construction project.

Affecting the safety of the main structure of buildings and structures.

Or the overall demolition of buildings will affect the safety of the main structure of adjacent buildings and structures.

2.

Halfen Frimeda

In this case, the illegal building may not be demolished.

If the “illegal building” becomes a “legal building” through correction or supplementary procedures, the building involved may not be demolished.

(3) Make administrative enforcement decisions.

4.

(4) Implement the decision of administrative compulsory demolition.

(2) Make a reminder.

built on corridors, roadsides, public green spaces, sidewalks and other land without approval.

The demolition cannot be carried out under the existing technical conditions.

(5) The unspecified majority of the society shall be announced and demolished within a time limit.

In fact, not all illegal buildings must be demolished at once.

If some buildings are demolished, the safety of the main structure of buildings and structures will be affected.

In some cases, illegal buildings may not be demolished temporarily or at all.

Due to the particularity of the building or the geographical location of the building, illegal buildings that cannot be demolished according to the existing demolition technical conditions may not be demolished.

3、 Must all illegal buildings be demolished? These four cases can not be dismantled.

(3) Buildings and structures newly built, expanded and reconstructed after the scope of demolition and expropriation is determined.

In this case, illegal buildings may not be demolished.

Referring to illegal buildings, we can associate the word “demolition”.

3.

(4) Buildings and structures newly built, built and expanded by occupying state-owned land and illegally occupying collective land in rural areas.

If the land use right certificate is obtained, but there is no real estate certificate, or there are no relevant planning procedures for construction projects, because certain procedures have been obtained, but the certificate is not complete, it can be renewed…

2、 How many steps can the demolition procedure of illegal buildings be divided into? (1) First, an administrative decision on demolition within a time limit must be made.

(6) Only when the parties concerned neither apply for administrative reconsideration nor conduct administrative litigation within the statutory time limit can they carry out compulsory demolition.

1、 What are the types of illegal buildings? (1) Buildings and structures newly built, built and expanded on collective land such as contracted land and homestead without approval, and the land use right is obtained through private transfer by farmers.

(6) Self built houses, that is, self built buildings around existing houses, courtyards, roofs and balconies.

(5) Booths, houses, etc.

The demolition may cause significant damage to public interests.

In accordance with the relevant provisions of China’s urban and rural planning law, those who have obtained the construction land planning license, site selection opinion and early land related procedures, and can obtain the final housing construction license or real estate property right certificate through correction or supplementary procedures can go through supplementary procedures, and should be given the opportunity to correct or correct within a time limit.

1.

Some illegal buildings may cause significant damage to public interests after demolition, or may cause other serious consequences after demolition.

Tags:

Related Post

High end residential: multiple courtyards, hotel style experience, nearly 100 meter wide entrance display surface, customized facade designHigh end residential: multiple courtyards, hotel style experience, nearly 100 meter wide entrance display surface, customized facade design

Due to their vertical lifestyle, high-rise residential buildings have relatively fewer opportunities for residents to interact. At present, we are constantly thinking about how to reconstruct space and life, how