Construction qualification handling and handling process of Danjiangkou City


Implement the reform of “multi drawing joint examination” of construction drawings in the whole region, develop and go online According to Ningxia construction drawing digital review system, construction drawing review is no longer limited by time and space, and the review time has been shortened from the longest 6 months in the past to 7-22 working days now.

Organize and carry out “three activities” to do a good job in simplifying administration and delegating power.

1、 General contracting qualification of service guide construction: construction, municipal administration, electric power, electromechanical equipment, highway, railway, port and waterway, water conservancy and hydropower, mining, metallurgy, chemical petroleum and communication.

  Fifth, continuously optimize the business environment.

Adhere to the principle of Party building leading League building, establish two youth research groups, and organize the implementation of the pilot project of the whole process network office of secondary constructor and the whole process online joint examination of work safety license.

  Second, strictly implement the “statutory authority”.

Since November 10, the “approval of urban domestic waste business cleaning, collection, transportation and treatment services” has been changed to “Notification commitment”, and the access services of “gas operation license issuance” and “approval of outdoor advertising facilities” have been optimized..

We will actively follow up and learn from the latest national spirit of deepening the reform of “release, management and service”, and adhere to the requirements of the CPC Central Committee, the State Council and the Party committee and government of the autonomous region on Deepening the reform of “release, management and service”.

The pilot project of the joint office of safety production license is progressing smoothly, reducing the examination and approval time by at least 25 working days compared with the legal processing time limit.

Over the past few years, the administrative licensing matters in the field of housing and construction have decreased year by year, and there are no new administrative functions and powers other than laws and regulations.

100% of the matters at the district level and 80% of the matters at the city (county) level can be “handled online without meeting”.

Zhaocaimao headquarters is located in Chengdu, Sichuan, a “Little Hong Kong” in Southwest China, enjoying a “land of abundance” Laudatory name.

(www.zhaocaimao8.

At present, there are more than 500 employees, the proportion of professional and technical personnel is more than 60%, and the number of registered technical talents with medium and high-grade technical titles and more than class I qualifications ranks in the forefront of the operation.

It is a company registered with the Administration for Industry and Commerce of Benxi City, Danjiangkou City, providing qualifications, handling qualifications, acting as a qualification agent, transferring various construction engineering qualifications, acting as a safe production license An enterprise management consulting company that provides talent services for construction enterprises (first-class and second-class constructors, middle and senior engineers, technician certificates, etc.), and provides efficient resource services for enterprise development.

52 municipal and county government services have been reduced and delegated successively, and all the 21 government services reserved at the district level have been stationed in the government service hall of the autonomous region for centralized handling.

  Fourth, vigorously implement the innovation of examination and approval.

We will further promote “one network, one door and one time” In the reform, the masses are no longer allowed to submit paper materials for information that can be queried online, and the masses are no longer allowed to go to the window for matters that can be handled online.

For 167 items in the region (96 at the district level, 89 at the municipal level and 71 at the county level) The matters in the field of housing and construction were sorted out and revised one by one, and the catalogue list and work guide of housing and construction government services in Ningxia Hui Autonomous Region were compiled and printed , further improve the standardization and standardization of administrative examination and approval in the field of housing and construction in the region.

We started in Chengdu and took Shu as the mainland.

Tibet (Tibet), Hubei (Hubei), Anhui (Anhui), Jiangsu (Jiangsu), Shanghai (Shanghai), Zhejiang (Zhejiang), Fujian (min), Hunan (Hunan), Jiangxi (Jiangxi), Sichuan (Sichuan, Shu), Chongqing (Chongqing), Guizhou (Guizhou, Guizhou), Yunnan (Yunnan, Yunnan), Guangdong (Guangdong), Guangxi (Guangxi), Hainan (Hainan), Hong Kong (Hong Kong), Macao (Macao), Taiwan (set).

Construction professional contracting qualification: environmental protection, decoration, electromechanical equipment, building curtain wall, ancient architecture, urban and road lighting, electronics and intelligence, fire protection, waterproof, anti-corrosion and thermal insulation, steel structure, formwork scaffold, foundation, hoisting equipment, ready mixed concrete, bridge beam, tunnel, highway pavement, highway subgrade, highway transportation, railway electricity, railway track laying and beam erection Railway electrification, airport runway, civil aviation air traffic control, airport visual navigation aid, port and coast, channel, navigation buildings, port and navigation equipment and water traffic management, hydraulic metal structure fabrication and equipment, water conservancy and hydropower electromechanical equipment, river and lake regulation, power transmission and transformation, nuclear engineering, offshore oil and special equipment.

Tel: 13881936628 zhaocaimao construction wechat: 13881936628 Danjiangkou zhaocaimao Construction Engineering Consulting Co., Ltd.

  Zhaocaimao enterprise processing consulting (Sichuan) Co., Ltd.

Second, carry out “three reductions and one improvement” activities (reducing links, materials, time limit and improving people’s satisfaction) The notice on simplifying the application materials for the qualification of enterprises in the field of housing and construction cancelled 116 application materials that could be verified and compared through the information on the official website, with a reduction rate of 21.4%.

First, clean up all kinds of supporting materials and clean up 60 supporting materials that are not supported by laws and regulations.

Actively promote the reform of “separation of licenses”.

  Third, streamline administration and delegate power in a down-to-earth manner.

Magnetic Box

The housing construction approval window of the autonomous region has also explored a cross departmental and cross-level “King” type approval mode, The “Hall flow” service mode of “one window connection, one order linkage, one station settlement and one door feedback” has been basically realized.

Third, carry out “package” service activities with “doing one thing well” as the unit, and include high-frequency matters such as “opening a construction company” and “establishment of Jinning project cost consulting enterprise” into the “package” Service, focusing on solving the problems of repeated submission of enterprise application materials and cumbersome business processes.

Com) referred to as zhaocaimao.

Service planning cities: Beijing, Tianjin, Heilongjiang, Jilin, Liaoning, Hebei, Henan, Shandong, Shanxi, Shaanxi, Inner Mongolia, Ningxia, Gansu, Xinjiang and Qinghai.

    Since this year, the Department of housing and urban rural development of Ningxia Hui Autonomous Region has taken five measures to implement the arrangements of the Party committee and government of Ningxia Hui Autonomous Region to further promote the convenience of examination and approval services, and continue to promote the in-depth development of the reform of “decentralization, management and service” in the field of housing and construction in the region.

With more than 10 years of intensive cultivation, our business has covered the whole southwest region and promoted to the whole country.

provides you with the latest construction information.

We will establish a coordination group for promoting the transformation of government functions and the reform of “release, management and service” headed by the main leaders of the Department to benchmark Opinions of the general office of the Party committee and the general office of the people’s Government of the autonomous region on deepening the reform of “do it when you don’t meet” and further promoting the convenience of examination and approval services; opinions of the office of the coordination group for promoting the transformation of government functions and the reform of “release, management and service” of the autonomous region on printing and implementing the deepening of “release, management and service” throughout the country and the region Notice on the plan for the division of key tasks in the spirit of video and telephone conference for the reform and transformation of government functions , two special meetings were held to study and deploy the implementation plan, one comprehensive supervision and two special inspections were carried out successively, two shifts of practical operation training for municipal and county approval personnel were organized, and one special training for the reform of project approval system was organized for municipal and county government leaders and backbone in charge of approval, so as to further enhance the consciousness of the district’s housing construction system to implement the instructions and requirements of the superior And execution.

  First, we will do a good job in publicity and implementation.

Adhere to the “territorial management” and “service sinking”, revise and publicize the list of administrative services in the area of housing and construction from bottom to top in multiple waves in accordance with the requirements of “statutory authority”, “consistency of rights and responsibilities” and “three centralization”, so as to ensure that there are no matters outside the list.

Through measures such as “reduction, merger and combination”, the time limit for handling administrative license approval matters at the district level has been reduced from an average of 14.3 working days to 4.6 working days.

Tags:

Related Post