IF BUIDING GREAT Precast Case Study – Design of Phase II of Liyang No.6 Middle School

Case Study – Design of Phase II of Liyang No.6 Middle School


The second phase of Liyang No.

6 Middle School has solved two difficult problems by adopting a “turning valley” posture: 1.

arranging new buildings as “sandwich cookies” in limited land use, and 2.

directly introducing the noise and shuttle traffic from urban roads into the campus.

Ferrule Loop Insert

.

Tags:

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post