2020 Zhengzhou City Engineering Series construction professional intermediate title appraisal interview reply notice


Notice of interview and reply for 2020 Zhengzhou Engineering Series construction intermediate professional title evaluation I

.

scope of interview and reply: apply for the personnel of 2020 Zhengzhou Engineering Series construction intermediate professional title evaluation committee

.

2、 Interview time: March 18-20, 2021

.

Three, interview answer place: Zhengzhou west side of the urban and Rural Construction Bureau (the road between the workers and Huaihe Road West 200 meters south) four, carrying materials: the two generation ID card or the registered residence certificate issued by the police station (brush the face, enter the ID card into the interview room after the interview, give it to the jury for verification, and get back from the scene)

.

5、 Notes: 1

.

The specific time of interview reply and examination room information have been sent to each respondent through the title declaration system

.

It is recommended to use 360 browser compatible mode to view

.

After receiving the notice, please reply “received” in the pop-up window in the lower right corner of the declaration system to facilitate staff statistics

.

2

.

The interview defense site will scan the itinerary code to show that the personnel from the middle and high risk areas of the epidemic need to provide the nucleic acid test report within the validity period

.

The personnel from the middle and high risk areas of the epidemic are requested to issue the nucleic acid test report to the hospital above Grade 3A in advance

.

No report is allowed to enter the site for defense

.

In addition to face recognition, experts are required to take off the mask when checking identity information, the rest of the time wear masks

.

If the epidemic prevention and control measures are not implemented, the respondent shall bear the consequences

.

3

.

Interviewees should queue up in the designated waiting area 30 minutes in advance

.

Those who fail to report in the specified time and complete the interview reply as required shall be deemed to have given up the qualification of this assessment

.

After entering the waiting area, the interviewees shall implement centralized closed management

.

During the interview, they shall abide by discipline, command and management

.

They are not allowed to walk around, make noise, contact with external personnel and use communication tools

.

In principle, the interview time should not exceed 8 minutes

.

After the completion of the interview, the interviewees should leave immediately according to the designated route, and should not stay or discuss in the waiting area

.

4

.

In case of violation of discipline, a warning shall be given according to the seriousness of the case, until the qualification of the interview reply is cancelled or the result of the interview reply is declared invalid; in case of serious disturbance of the order of the interview reply, the case shall be seriously dealt with according to relevant regulations

.

March 10, 2021.

.

Tags:

Related Post

Title Review: Construction Engineering, engineering management, roads and bridges, civil engineering, industrial and civil construction andTitle Review: Construction Engineering, engineering management, roads and bridges, civil engineering, industrial and civil construction and

Note: resolutely resist counterfeiting. Li registration address: room 216, unit 2, shop 2, zundi, Wanhui city (North District), Pukou District, Nanjing (Wanhui city station of Metro Line 10) education promotion