220831 building construction procedures and construction methods


Send the release date of the demand document or the official account link of the project article to the small assistant; 3.

According to the document content (15 yuan / piece) ———————————– acquisition method 2:.

Scan and add the small assistant wechat below: 2.

The original document can be sent after payment; 4.

Plate Rebar Anchor

Are you still worried about the boss asking you to make a common construction drawing, project PPT, indoor decoration house type drawing and road and bridge construction scheme? Are you still worried about your construction project summary Are you worried about the poor performance of the water conservancy engineering paper? Pay attention to the design data of the water conservancy supervision building of the office garden obtained from this official account, building type drawing, building construction drawing, scheme drawing, drainage and HVAC engineering cost, geotechnical engineering, road and bridge engineering management, and the purchase of a single document does not need to be forwarded, Add the following small assistant wechat consulting directly: 1.

Tags:

Related Post