Analysis of Collaborative Work Points in the Deepening Design Stage of Prefabricated Concrete Buildings


The smooth implementation of prefabricated construction projects depends on seamless connection and efficient collaboration between each link, especially in the stage of deepening design.

How to cleverly gather various needs and resources such as construction drawing design, factory prefabrication production, on-site installation and construction, and build a collaborative closed-loop system is the core driving force for the smooth progress of the project.

This article aims to delve into the importance of design collaboration mechanisms, analyze the challenges encountered during implementation, and elaborate on a series of specific collaboration strategies and problem-solving solutions, with the aim of providing reference for professionals in the prefabricated construction industry.

swift lift clutches

.

Tags:

Related Post

Today’s live broadcast | Exploration and practice of urban renewal by architectural design enterprises: Chongqing Academy&Huajian GroupToday’s live broadcast | Exploration and practice of urban renewal by architectural design enterprises: Chongqing Academy&Huajian Group

Yao Jun has in-depth research and practice in enterprise strategic management, organizational management and innovation management, leading the enterprise to achieve rapid development and outstanding achievements, and was awarded the