Application of Deepening Design and Construction Technology for Complex Building Facade Climbing Frame


A project in Guangzhou is a commercial and residential complex built on top of a subway, which includes 6 high-rise residential buildings and 1 high-rise office building.

The available construction land area is 58027 square meters, with a building area of 480000 square meters.

The first and second residential buildings have a total of 48 floors and a building height of 149.

1 meters.

The third and fourth residential buildings have a total of 44 floors and a building height of 138.

5 meters.

The fifth and sixth residential buildings have a total of 40 floors and a building height of 127.

05 meters.

The eighth office building has a total of 33 floors and a building height of 168.

5 meters, all of which use climbing frames above the standard floor.

magnetic recess former

.

Tags:

Related Post

Crack down on false reports of building materials testing, and Zhejiang Provincial Department of housing and urban rural development issuedCrack down on false reports of building materials testing, and Zhejiang Provincial Department of housing and urban rural development issued

The quality inspection organization must carry out the inspection in strict accordance with the engineering technical specifications and inspection and test standards, and be responsible for the authenticity and accuracy