[architecture can be read] there is a “financial door” hidden in the Bund buildings. Do you know where it is?


In the 1980s, the Shanghai Space Administration also entered the office.

15 repair project lasted nearly four years.

There are exquisite and elegant painted glass corridors around the second and third floors.

Therefore, composite materials are adopted and the exterior is sprayed with imitation stone paint.

The building has the style of neoclassical Renaissance and was completed in 1902.

In 1993, the building was renovated.

The foreign exchange trading center building of China Russia Dawson bank building, completed in 1901, is a 3-storey (locally 5-storey) masonry reinforced concrete hybrid structure building.

There is a symmetrical white marble staircase leading to the second floor in the hall.

The human face image at the lower part of the cornice is repaired by sculpture.

The main entrance is located at No.

1.

During the repair, the original granite step elevation is gradually exposed by chiseling the sidewalk floor.

Please pay attention to personal protection, do not pile up or gather, and achieve the “three piece set” of epidemic prevention and the “five requirements” of protection.

Building renovation in 2009, China foreign exchange trading center repositioned the building and realized the four functions of the building through overall renovation, namely customer service center, business exhibition center, conference reception center and local disaster recovery center.

This structure is supported by a stable and thick brick wall, the floor structure is made of I-steel multi rib, the middle is filled with concrete, and the window is made of light brick arch.

The repair team restored the facade according to the historical photos and the understanding of the historical building body, combined with the residual traces on the site.

The building used to be the centralized office of Shanghai democratic parties.

According to several expert review opinions, the wood carved human face on the top of the west wall cabinet in Room 301 is adopted.

Building entrance map due to the changes of the Bund for more than 100 years, road reconstruction for many times, and the settlement of the building body, there is a common situation that the sidewalk pavement is higher than the indoor floor elevation in Zhongshan first road.

The foundation of the building did not adopt pile foundation, but adopted sand cushion foundation and raft foundation, which was rare in Shanghai at that time.

In 1991, Shanghai foreign exchange adjustment center obtained the property right of the building through replacement, becoming the first financial institution to enter the Bund through replacement.

The carved iron gate building is exquisitely decorated and forms a symmetrical structure with the main gate as the central axis.

Due to the preservation of historical photos from different angles and the chiseled traces left in the current situation, the outer contour size of the human face can be accurately judged, so it can be restored more accurately.

However, some parts cannot be restored faithfully due to the limitation of use function.

There are 4 coupon windows on the ground floor, and the gate is carved iron gate.

At the same time, Chisel out the indoor floor filled in later stage until the flower decoration cylinder brick floor at the entrance, and find the original floor elevation through indoor and outdoor synchronous drainage.

Now it is Shanghai clearing house..

3 restore indoor space in 1993, a large number of equipment and pipelines were added during the transformation of the room, so the elevation decreased more under the original ceiling.

The ceiling at the top of the building hall.

Considering that the human face image at the lower part of the cornice cannot be fixed by pulling the loop from the inner side, it can only be hung externally.

At present, the building has 7 floors above the ground (8 floors in some parts), with a total construction area of about 13000 m2.

2, East Beijing Road, and the east entrance is No.

It is three stories high.

The doors, windows and floors on each floor of the upstairs are made of Eucalyptus.

The 1 gates of the entrance gate of the building are exquisite and beautiful, and the two pillars of daily attendance on the two sides of the gate and the exquisite and exquisite top mountain flowers are the essence of the entire building facade.

Today, let’s learn about the “financial gate” of opening to the outside world – the building of China foreign exchange trading center.

There are also exquisite figure reliefs on the inner wall of the second floor.

Since then, it has been rented by many institutions such as Shanghai Second Light Industry Bureau.

2.

The most important work of this repair is to rearrange the equipment and pipelines, expose the original ceiling and restore the historical space.

The repaired cloister Bund No.

After the repair, what is displayed in front of the world is the China foreign exchange trading center full of historical vicissitudes and meeting today’s use needs.

It is an early building equipped with elevators in Shanghai.

The internal Hall of the building is three floors high and covered with painted glass ceiling.

The well-known buildings in Shanghai Bund complex are either outstanding in volume or unique in location.

2.

The facade of the building after restoration and repair is basically intact, but in the West facade and south facade, due to the overlapping and expansion of auxiliary buildings in history, the facade has a certain impact, so it is the focus of this repair.

It covers an area of 1460 ㎡, with a construction area of about 5000 ㎡.

Double Ended Ferrule

For example, the aluminum alloy double-layer hollow glass window is still used for the outer window, and the front facade corridor on the third floor is still closed.

28, Shandong first road.

The bottom of the outer wall is built with Suzhou granite, and the white glazed tiles are inlaid with granite, with harmonious tone.

Among them, there is such a classical building, which looks insignificant, but has a loud name.

There are three floors of exquisite painted glass pavilions around the hall, with three floors of exquisite painted glass pavilions.

In April 1994, the China foreign exchange trading center under the people’s Bank of China was established and grandly opened here, and the building became the office space of the center.

The column base of the external facade of the building is buried below the sidewalk floor, resulting in the uncoordinated proportion of TASS dry columns on both sides of the building entrance.

From the perspective of historical photos, it is difficult to clearly distinguish the relationship between stem angle and photography distance.

The building itself, the foreign exchange trading center building, was designed by Heinrich Baker and undertaken by Shanghai xiangmaoji construction factory.

Through step adjustment, the addition of drainage ditch, the combination design of additional buried lamp and floodlighting, the height difference relationship along the entrance of the Bund is combed smoothly, the column base of the original column is exposed, and its facade proportion relationship is improved.

Although the building is only three floors high, it is equipped with elevators.

The green mail ship building was built by British merchant green mail ship company (also known as Yitai foreign firm), designed by Gonghe foreign firm and completed in 1922.

Tags:

Related Post

Authentic labor protection gloves, foam protection, wear-resistant, anti-skid, breathable, construction site, latex dipped rubber coatedAuthentic labor protection gloves, foam protection, wear-resistant, anti-skid, breathable, construction site, latex dipped rubber coated

Cast in Sockets ¥ 11 Earned price Original price: ¥ 13 Sales volume of 100000+genuine labor protection gloves Foaming protection, wear-resistant, anti-skid and breathable construction site latex dipped rubber coated