The drawing review organization shall calculate the relevant indicators according to the approved feasibility study report (or approved preliminary design scheme) or planning and design conditions . By 2025, the
The second edition of this book is prepared in accordance with the code for supervision of construction projects (gb50319-2013) and the latest code for acceptance of construction quality, with a
Recently, a steady stream of citizens came to Shunyi District to purchase Phalaenopsis. The architectural live lighting show is located in 9 landmark buildings, including the Olympic Tower and CBD