be careful! Such sheds in high-rise buildings should be demolished before the end of September!


From July 5, the remediation work entered the site demolition stage

.

In order to deeply learn the lessons of high-rise building fire accidents and prevent and reduce fire hazards, our district started the special rectification of combustible canopy and protruding external wall protective net of high-rise buildings in the whole region in early may according to the relevant requirements of the superior

.

▲ community workers’ household publicity policy up to now, 1107 combustible canopies have been demolished in the region, with a rectification rate of 38.5%; 9847 outstanding exterior wall protective nets have been rectified, with a rectification rate of 35.1%

.

Reporter: Wang Ming, Zhang Yu   Trainee reporter: Li Jiali video editor: Xia Tingting editor: Tian Wenrui   Editor and reviewer: Hu Desai on duty deputy editor in chief: Yi Zhihui editor in chief: Luo Yujiang declares that all platform works belonging to Jiangjin district financial media center shall not be used without authorization

.

Through the two-day concentrated action on July 14 and July 15, it is expected that the protruding external wall protective net of 85 households and the combustible canopy of 6 households will be removed

.

On July 14, led by the district housing and Urban Rural Development Commission, the local Luohuang town organized the public security, neighborhood committee and construction unit to dismantle the combustible canopy and protruding external wall protective net of high-rise buildings in Luohuang community, Luohuang town, effectively eliminate potential fire safety hazards, ensure the safety of people’s lives and property, and fire safety is more important than Mount Tai ▲ construction personnel are working on combustible canopy, anti-theft net Balcony combustibles are the fatal “killer” of fire safety

.

▲ a cordon has been set up around the community

.

The combustible canopy shall be removed or replaced with non combustible and non combustible materials; Remove and replace the protruding external wall protective net; At least two emergency evacuation exits (opening size not less than 1m) shall be set for the protective net with the outer edge flush with the outer wall or within the outer wall × 0.6m)

.

Next, relevant towns and streets (platforms) will continue to intensify their work and speed up the rectification progress to ensure that all rectification is completed by the end of September

.

▲ the protective net is being demolished ▲ for the demolished protective net, the relevant person in charge of the district housing and Urban Rural Construction Committee gave a detailed answer to the problem of remediation scope and remediation standards that the citizens are most concerned about“ The combustible canopy and protruding external wall protective net in this renovation refer to the structures or facilities installed on the windows, balconies and external corridors of high-rise residential buildings (residential buildings with 9 floors and above)

.

The demolition work can be completed before the end of this month

.

After thorough statistics, a total of 16 towns (platforms) in the region are involved in this special rectification work

. Corn Magnetic Box

As one of the 16 town streets (platforms) involved in the regulation of combustible canopy and protruding external wall protective net of high-rise buildings, 6 households involved in the regulation of combustible canopy and 100 households involved in the regulation of protruding external wall protective net of high-rise buildings in Luohuang town

.

” The official said

.

456 buildings involving combustible canopy renovation in high-rise buildings, with a total of 2875 households; A total of 705 buildings with 28053 households are involved in the renovation of protruding external wall protective net

.

Tags:

Related Post

Geometric Topology and Numerical Intelligence Construction: Design of “Linpan Yunyan” Chengdu Dayi Rural Neighborhood Center | Yuan Feng,Geometric Topology and Numerical Intelligence Construction: Design of “Linpan Yunyan” Chengdu Dayi Rural Neighborhood Center | Yuan Feng,

Since its inception, Time Architecture has been focusing on creative contemporary Chinese architectural works in various forms. We insist on selecting completed works, paying attention to their innovation and exploratory