BIM engineering application of building curtain wall engineering – construction stage


2.

9.

The curtain wall shall not be processed on site.

Create the completion delivery model of curtain wall project according to the construction process model, accurately express the geometric, non geometric, component attributes and other relevant information of curtain wall model elements, and ensure the consistency between the model and the project entity.

The construction drawing design model or curtain wall processing drawing design model of curtain wall engineering shall incorporate relevant information such as construction technical standards and construction technology to form a construction process model.

The virtual simulation technology is used to compare the planned construction period with the actual construction period, analyze the differences and causes, formulate the general construction period plan and each stage construction plan, and control the construction progress.

In relevant aspects of curtain wall engineering, 3D visualization technology should be used to understand the design intention.

8.

The construction process model of curtain wall engineering should reach the level corresponding to the smallest unit of resource allocation.

4.

Through the resource allocation elements, verify the feasibility of the construction scheme and realize the interactive visual information management of the construction process.

10.

BIM application in the field installation stage of curtain wall engineering 21.

Flat Steel Anchor

After the material code is generated, the material number can be updated in real time according to the design change, and continue with the material in the production process.

6.

Output relevant data through the completion delivery model of curtain wall project and serve as the basis for archiving the completion delivery data..

Use the construction process model, adopt visualization function and on-site video monitoring system to control the construction quality and safety of the project.

Using virtual construction technology, compare the budget cost and actual cost, analyze the differences and causes, revise the cost control plan and control the construction cost.

2.

BIM application in the production and processing stage of curtain wall project 11.

  BIM application in the completion acceptance stage of curtain wall project 31.

According to the construction drawing design model of curtain wall engineering, pre evaluate the design change or change negotiation documents, and confirm the change contents.

According to the construction drawing design model of curtain wall engineering, collect, analyze and process the construction method, construction sequence and other information in the installation process.

5.

Intelligent equipment such as 3D scanner and measuring robot should be used for auxiliary measurement and setting out of curtain wall construction.

It is appropriate to use 3D visual simulation of the construction scheme to verify the feasibility of the construction scheme.

Establish an independent file for each part in the machining model, with a unique material code.

7.

2.

3.

11.

3.

According to the process requirements of material processing, simulate the process data such as NC processing mode, processing technology and processing data transmission, and analyze and optimize the obtained processing data, processing path and processing time.

According to the construction process model of curtain wall engineering, the technical disclosure of curtain wall engineering is targeted and operable.