2.

According to the structural relationship, functions, flow direction and other factors at the bottom of the figure, the primary and secondary cores and node space can be distinguished.

The west is high and the east is low.

(4) 35000 square meters of underground parking lot shall be set in combination with the entrance and exit.

Task requirements: (1) Complete the planning and design of the lot, and draw the general plan on one Al drawing with a scale of 1:1000.

The internal topography of the base is undulating It is high in the west and low in the east.

The base has a broad view, overlooking Bailuyuan and Chanhe River, as shown in Figures 2 and 3.

Overview 1.

The overall planning, spatial layout and landscape design shall be carried out around the three themes of farming, health preservation and leisure in combination with the regional environment, base characteristics and prediction of future development of the lot.

(3) The agricultural exhibition museum covers an area of about 10000 square meters.

The red line of Changming Road is 70m, and 15m green belts are reserved on both sides.

(3) The drawing shall comply with the provisions of Standard for General Drawing (GB/T50103-2010), and shall be expressed in monochrome line drawings.

Underground parking is arranged in combination with the entrance and exit, and a pure pedestrian streamline is built in the base.

(2) The folk town covers about 30000 square meters.

2.

The overall planning, spatial layout and landscape design shall be carried out around the three themes of farming, health preservation and leisure in combination with the regional environment, base characteristics and prediction of future development of the lot.

The project is positioned as a cultural and leisure town with regional characteristics and hot spring recuperation function in the suburbs of Xi’an, integrating display, health preservation, sightseeing, catering, entertainment, shopping, accommodation and other functions.

The main functional areas should include hot spring resort area, folk town area, and agricultural culture exhibition area (separate each area and form its own characteristics).

The terrain inside the base is undulating (pay attention to the terrain inside the base, the roads should conform to the terrain as much as possible, and the building layout should avoid the area with dense contour lines).

The functional buildings in the base are mainly arranged in the east and southwest, close to the peripheral roads, to solve the traffic and fire problems.

(4) 35000 square meters of underground parking lot shall be set in combination with the entrance and exit.

The construction content is required to have a total planned building area of 80000 square meters, including: (1) The hot spring resort should include an open-air courtyard hot spring area, a public recreation hot spring area, 20 sets of holiday hot spring villas, a hot spring resort hotel and a comprehensive service area, with an area of about 40000 square meters.

The main functional areas should include hot spring resort area, folk town area, and agricultural culture exhibition area.

The red line of South Dulingyi Road is 65m, and a 25m green belt is reserved on both sides.

Flat Rubber Recess Former

The intersection of the east-west axis and the north-south axis can be used as the node space.

Key words and important information are extracted.

3、 Scheme interpretation 1.

The traffic is convenient, as shown in Figure 1.

(2) The separation of people and vehicles can be considered, and a pure pedestrian streamline can be built in the base.

The total planned building area is 80000 square meters, including: (1) The hot spring resort should include an open-air courtyard hot spring area, a public recreation hot spring area, 20 sets of holiday hot spring villas, a hot spring resort hotel (in terms of architectural form, four major hot spring functional buildings are distinguished to form a certain building cluster) and a comprehensive service area (generally considered to be arranged in combination with the entrance and exit positions), about 40000 square meters.

The spatial structure mainly forms the east-west axis, and the natural landscape of Bailuyuan on the east side is introduced into the base, which can be realized with the help of virtual axis, real axis and pedestrian streamline.

The planning and design section is located in the east of Duling Plateau of Qujiang Phase II in Xi’an, bounded by Changming Road in the east, and faces Bailuyuan across the Chanhe River (interpretation: the natural conditions around the plot are good, and there is a large elevation difference between the inside and outside of the plot, so it is necessary to consider the relationship between the base and surrounding landscape elements, and do a good job of landscape infiltration of the base), It is adjacent to the Tang Garden Cultural Tourism and Leisure Area in the west and Du Mausoleum of Emperor Xuandi in the Han Dynasty (interpretation: the important functions around the plot need to consider the connection between the base and its function and streamline, and the continuation of the architectural form), and the South Road of Du Lingyi in the north.

Several points for further consideration: (1) Due to the complex terrain in the base, attention should be paid to the consideration of contour lines in the design and construction.

In the area with dense contour lines and large elevation difference in the base, agricultural display and experience can be arranged in combination with functional themes, such as land landscape, agricultural experience base, etc., or treated as green landscape.

The red line of South Dulingyi Road is 65m, and a 25m green belt is reserved on both sides.

The first question of the early test of Xi’an Construction University in 2020.

Secondly, the north-south axis relationship is built in the base in combination with the main flow lines to connect the functional areas in the base.

3.

A mountain col passes through it, and the planned road is connected with Tangyuan Leisure Area.

(2) Draw relevant planning structure drawings, prepare planning and design instructions, and technical and economic indicators.

The base covers an area of 17.5 hectares, 290 meters wide from east to west, and 750 meters long from north to south.

(2) The folk town covers about 30000 square meters.

The base covers an area of 17.5 hectares, 290 meters wide from east to west, and 750 meters long from south to north.

The background planning and design site is located in the east of Duling Plateau of Qujiang Phase II in Xi’an, bounded by Changming Road in the east, facing Bailuyuan across the Chanhe River, connecting China’s Tangyuan Cultural Tourism and Leisure Area and Emperor Xuandi Duling in the west, and Dulingyi South Road in the north.

They can be arranged in the area with sparse contour lines and flat terrain on the east side.

The traffic is convenient, see Figure 1.

Buildings and roads should not be arranged perpendicular to the contour lines as much as possible.

The base has a broad view, overlooking Bailuyuan and Chanhe River, as shown in Figures 2 and 3.

2、 Analysis of the assignment 1.

There is a col passing through it, and the planned road is connected with the Tangyuan leisure area.

(3) The agricultural exhibition museum covers an area of about 10000 square meters.

The red line of Changming Road is 70m, and 15m green belts are reserved on both sides.

Click the blue word “TEAM Design Group” above “Pay attention to us.

Pay attention to the distinction when expressing..

The project is positioned as a small cultural and leisure town in the suburbs of Xi’an with regional characteristics (which can be reflected in the traditional architectural style, architectural texture, regional cultural functions, etc.) and hot spring recuperation functions, integrating display, health preservation, sightseeing, catering, entertainment, shopping, accommodation and other functions (i.e., overall positioning and functions).