Click the blue words above to follow our purification home, and share the purification industry standard specification, design, construction, operation, equipment, tools, consumables, information, management and other comprehensive purification industry information every day.
Biosafety Laboratory sewage must be disinfected and sterilized.
For dry purification, it is necessary to know the national standards, because the national standards are the laws and regulations of the purification industry.
From today on, we will share the Technical Code for Building of Centers for Disease Control and Prevention (GB50881-2013) with the team and the national interest, expecting more people to benefit.
You are welcome to contribute, consult, cooperate, contact 18615277004, or contact the post editor on WeChat.
6.1.2 Water supply and drainage main pipes in rooms with cleanliness and biosafety requirements shall be laid in technical interlayer or technical lane, or buried.
Read the national standards thoroughly, frequently and frequently, and combine them with practical work at all times.
For more purification information, please refer to More than 90 Purification Materials Free Loan 20221220, More than 40 Purification Materials Only Use 8 yuan, Video, Audio, Article, All the Purification You Want Here, whether “like the author” or forwarding, Even if you open the advertisements automatically added in the background of the text and after the text, you can add a “big steamed bun in Shandong” to Xiaobian********************** Chat up a small editor..
Welcome to Purify Four Kinds of Groups, Follow the Rules (open the link to see details).
P22 to be continued: more highlights: 1 – Foreword 2 – Not applicable to the country and P43 – General principles 4 – Terminology 5 – Site selection 6 – General layout 7 – People flow and waste do not share 8 – The slope should not be greater than 1/109 – Two storey elevator 10 – Experimental room 11 – Physical and chemical laboratory design 12 – Clean laboratory design 13 – Business and administrative room 14 – Guarantee room 15 – General provisions for structure 16 – Materials 17 – Foundation 18 – Structural layout 19 – Load value 20 – Main structure and structure 21 – More purification communication groups for water drainage, recognize and implement the group rules.
6.1.3 The sewage in experimental and non experimental areas should be discharged separately, and the sewage discharge should meet the requirements of current national standards.
6 Water supply and drainage 6.1 General provisions 6.1.1 When the CDC building is newly built, expanded and reconstructed, the water supply The drainage and sewage treatment works shall comply with the current national standards GB50013 (Code for Design of Outdoor Water Supply) and GB50014 (Code for Design of Outdoor Drainage) Code for Design of Building Water Supply and Drainage) (GB50015).
The pipes in the clean room should be concealed, and the pipes related to this room should not pass through.