Building structure – 50m crack on the outer wall of a residential building in Changsha! It took 17 years to complete


Fixing Socket Cross Hole Nail Plate

There are vertical cracks in a residential building in Changsha, and the width of the cracks is large below and small above.

What do you think is the reason? On the morning of October 7, the owner of a community in Changsha disclosed that there was a crack on the outer wall of a high-rise residential building with more than 30 floors from the roof to the fourth floor.

Star setting: enter the official account homepage, click the “top” corner, click “set star”, and the official account will appear yellow Pentagram (Android   The operation is the same as that of IOS users).

Then how did the crack form and whether it would affect the wall? The owners expressed great concern.

Judging by the height of the floor, the crack is more than 50 meters long and almost as wide as your fingers, which is shocking.

In case of infringement or the owner of the original copyright disagrees.

It was suggested to inquire after work.

The property department said it was not clear for the time being.

The owner’s doubts have not been eliminated.

Several owners of Building 1 said that they saw someone applying asphalt on the 6th, so they noticed the crack on the outer wall.

What do you think of this? The message area can share ~ source: Netease News client, civil engineering bar, picture source: Netease News client warm tips 1) some pictures in the article come from the network, and the copyright belongs to the original author and source.

Because the official account official has adjusted the push rules, if you want to continue to receive the contents of the official account, please set the public building number of the building as the star sign, and more points of the “look at” and “praise” in the end of the article.

It can’t be covered up after brushing with asphalt.

“If you want to continue to receive the official account, please note that the” WeChat “is a public key.

The owner sought the truth behind the crack.

Tags:

Related Post

Relevant policies of prefabricated building industry in China and some provinces and cities vigorously develop prefabricated buildingsRelevant policies of prefabricated building industry in China and some provinces and cities vigorously develop prefabricated buildings

According to the in-depth study on the status quo and development trend analysis report of China’s prefabricated construction industry (2022-2029) released by the research report website, China has issued many

Notice on strengthening supervision over fire control construction quality of housing construction and municipal infrastructure projectsNotice on strengthening supervision over fire control construction quality of housing construction and municipal infrastructure projects

outdoor engineering construction stage. For the secondary decoration project, it is also required to check whether the original construction project has passed the fire acceptance by the fire acceptance department,