Building structure – sudden! The collapse of the bridge under construction by China Railway has killed 2 people and lost contact with 3


You can reach Hengqin from Jinwan in 10 to 15 minutes

.

Safety production, alarm bell ringing! Introduction to Jinhai bridge on March 16, 2018, the construction of Jinhai bridge began

.

The relevant rescue work was still in an intense and orderly manner

.

Source: Beijing News   Tencent video, Zhuhai release

.

After the construction of the bridge, the distance between Jinwan and Hengqin will be greatly shortened

. Lifting Anchor

The bridge also adopts the shape of shells and waves across Modaomen and Baiteng River, which is the symbol of Zhuhai

.

After the accident, the main leaders of Zhuhai municipal Party committee and Zhuhai municipal government rushed to the scene to organize rescue

.

Warm tips 1) some pictures in this article come from the Internet, and the copyright belongs to the original author and original source

.

The provincial emergency management department, the Provincial Department of communications and the provincial SASAC immediately organized forces to rush to the scene of the accident to guide the rescue, and quickly dispatched professional technical forces and large machinery and equipment from surrounding cities to participate in the search and rescue work

.

In case of infringement or the owner of the original copyright disagrees

.

The construction unit of Jinhai bridge construction section of Zhuji city rail transit is Guangdong Guangzhu Intercity Rail Transit Co., Ltd., the survey and design unit is China Railway Fourth Survey and Design Institute Group Co., Ltd., the construction unit is China Railway Construction Bridge Engineering Bureau Group Co., Ltd., and the supervision unit is Tianjin New Asia Pacific Engineering Construction Supervision Co., Ltd

.

It is recommended to read the building structure | civil engineering is not soil or wood, and the rammed earth wall is high and big! Building structure accident investigation: the “3.4” tunnel structure of Shenzhen Metro Line 1 was pierced through the building structure, and the 8-high corridor collapsed, resulting in 1 death and 14 injuries! Zhejiang province carries out potential safety hazard investigation of overhead corridor

.

At 9:25 on July 25, a box girder collapse accident occurred in the construction section of Jinhai bridge of Zhuji urban rail transit, resulting in the loss of contact of five construction workers

.

Next, the on-site rescue command department will go all out to carry out search and rescue at all costs, find other drowning personnel as soon as possible, and do a good job in the aftermath such as appeasing their families

.

At that time, it will only take 25 minutes from Gongbei to Zhuhai airport

.

The follow-up rescue will be reported to the society in time

.

What is anti floating anchor? Building structure – 9 dead and 8 injured! The 5-storey demolition building collapsed and was buried when the bus passed! Attention to building structure! Ministry of housing and urban rural development: from July 1, if the first-class constructor fails to apply for renewal of registration, the registered specialty will become invalid! 1

.

As of 17:41, rescuers found two drowning people in the underwater box girder at the scene of the accident and confirmed that they were killed

.

Tags:

Related Post

Ministry of housing and urban rural development: Catalogue of elimination of construction technology, equipment and materials endangeringMinistry of housing and urban rural development: Catalogue of elimination of construction technology, equipment and materials endangering

In order to facilitate peer communication and resource sharing, we have established a wechat group of various disciplines and posts. The practitioners of housing construction and municipal infrastructure projects shall

The measures of epidemic prevention and control and resumption of production of the construction company’s Yunnan Pugao Qiubei YanshanThe measures of epidemic prevention and control and resumption of production of the construction company’s Yunnan Pugao Qiubei Yanshan

Author: Tension Source: Yunnan Pugao Qiubei Yanshan Project Department Editor: Jiang Xueli Sponsored by: Party Committee Office of China Railway No.8 Engineering Group Construction Company (Corporate Culture Department).. Ringlock Scaffolding