Can apply if 7 conditions are met! Here comes the opening (resuming) guide for Hebei construction site


The communication history and contact history of all personnel returning to work in the project within 14 days shall be checked in detail and recorded in detail.

6.

The living quarters, office areas, canteens and toilets on the construction site have been disinfected and sterilized, and the key areas such as densely populated areas have been disinfected regularly.

Click the blue link to check the latest tips in Hebei ↓↓↓ Ensure the safety of resumption of work and production! The latest tip from Hebei has come [Report | Hebei Daily reporter Song Ping] [Editor | Zhao Xiaobo] Prohibit.

5.

Separate isolation observation room shall be set up for personnel who need to observe temporarily.

If the seven conditions are met, you can apply for meeting the seven conditions, and you can apply to the local competent construction department for starting (resuming) work: 1.

Ensure that the epidemic prevention materials are sufficient and in place, and the project should prepare enough temperature guns, masks, thermometers, disinfectants and other epidemic control supplies.

Erection Anchor One Sided

Personnel management shall meet the specific requirements of “five aspects” on-site management and epidemic emergency response.

The construction site shall adhere to the “six no” principle when starting (resuming) construction: the construction site shall not resume without establishing a joint control and prevention organization; The construction site shall not resume work without formulating epidemic prevention and control plan; No full-time epidemic prevention and control personnel are allowed to return to work at the construction site; The personnel entering the site shall not return to work until they are thoroughly checked; The construction site shall not resume work without storing temperature guns, masks, gloves, disinfectant and other prevention and control materials; The construction site shall not be resumed without comprehensive disinfection and sterilization.

Implement the real name system management, strictly implement the real name system for attendance at entrance and exit, and truly collect and input the real name information of all the personnel entering the site, such as their names, ID number, types of work, teams, places of origin, and contact information.

The epidemic prevention and control guarantee measures and safe production conditions meet the requirements for resumption of work.

3.

2.

Set up an epidemic prevention and control organization in the charge of the project leader, set up a special post for epidemic prevention, connect with the local competent construction department, health and epidemic prevention department or disease control organization, and fully implement various epidemic prevention and control measures.

4.

7.

On February 4, the Department of Housing and Urban Rural Development of Hebei Province issued the Guidelines for the Opening (Resumption) of Construction Sites during the Prevention and Control of novel coronavirus Pneumonia Epidemic in Hebei Province, which put forward specific guidance on the opening (Resumption) principles, opening (Resumption) conditions, personnel management requirements, on-site management requirements, and emergency response to the epidemic.

Adhere to the “six no” principle, local construction administrative departments shall strictly manage the commencement (resumption) of construction, not only do a good job in verifying the safety production conditions of the commencement (resumption) of construction, but also carry out on-site verification of epidemic prevention and control in accordance with the local epidemic prevention and control requirements, one qualified, one started.

The isolation observation room shall meet the requirements of the local health and epidemic prevention department or disease control organization.