Closed management of construction sites across the province


At the same time, it is necessary to carry out epidemic prevention and control and fire safety inspection in combination with the safety inspection of the construction site, focusing on whether the epidemic prevention and control measures are implemented, whether the fire safety responsibility system and fire watch system of the construction site are implemented, whether the construction electricians, welders and other special operators work with certificates, whether the hot work on the construction site conforms to the corresponding operating procedures and is guarded by special personnel, and whether the construction site Whether the fire risk management of temporary fire and electricity in the staff dormitory is in place, etc.

Health observation points are set at the entrance of the construction site to carry out temperature detection, health code and travel code inspection, so as to ensure that the registration of entry and exit personnel at the construction site and the temperature detection of on-site personnel are fully covered.

The construction site should be equipped with enough masks, disinfectants, protective clothing, disposable gloves, body temperature detection equipment and other health and epidemic prevention supplies, so as to ensure sufficient reserves, use and transfer at any time, and ensure the daily needs of on-site employees.

Recently, the Provincial Department of housing and urban rural development issued the notice on strengthening the epidemic prevention and control and fire safety management of construction sites, requiring that the construction sites be strictly closed, and irrelevant personnel are strictly forbidden to enter.

The construction site, offices, dormitories, canteens and other areas should be disinfected and sterilized regularly according to the regulations; The garbage disposal at the construction site should be strengthened, and special collection containers for waste masks should be set up at the construction site, living areas and office areas; ‹ strictly do a good job in garbage storage and transportation, sewage treatment, ditch and sewer dredging, and it is strictly forbidden to dump garbage without permission; Increase the reserve of epidemic prevention materials.

The notice clearly stipulates that according to the local epidemic prevention and control requirements, all participating units should be urged to implement the main responsibility, and the participating units on the construction site should be urged to strictly manage the disinfection of public places.

Magnetic Thread Disc

(He Ke) editor: Chen Ping editor: Zu Wenting reviewed by: Tao song source: Anhui Daily ↓↓↓ click on the lower left corner“.

Tags:

Related Post

In 2023, the college of architecture and art design of Hebei University of Technology will take the postgraduate examination of 733 DesignIn 2023, the college of architecture and art design of Hebei University of Technology will take the postgraduate examination of 733 Design

Template answers are professional, standard, fast, and high scores. True Postgraduate Examination Questions The summary of the true questions of the national famous universities’ design theory and design history (including