Daily practice and answers of Building Practice of the First Construction Project in 2022


Cost for use of instruments and meters E.

A.

Cost for safe and civilized construction D.

Inspection and test fee See answer analysis 1.

[Answer] D [Analysis] This question examines other project costs.

Stamp duty B.

Teacher Liu 15279458777, Teacher Gao 15179413330, Teacher Deng: 19318842011, Teacher Qing: 19194998868, pay attention to obedient education, and learn more about textual research knowledge..

A.

2.

Daily practice and answers to the Construction Practice of the first-class constructor in 2022 1.

A.

3.

[Answer] B [Analysis] This question examines the division of project cost according to cost components.

Shunchong Education focuses on vocational training, and its main businesses include: engineering: first and second level constructors, first and second level cost engineers, registered fire engineers, eight members (constructors (surveyors), quality officers, safety officers, standards officers, materialmen, mechanics, labor workers (budget officers), documenters), etc; Education promotion: promotion from college to college, college to undergraduate, postgraduate entrance examination, master’s degree and doctor’s degree (with a large enrollment rate of master’s degree, special training courses and guidance from famous teachers) Medical: licensed pharmacists, licensed doctors, competent nurses, health managers, psychological consultants, nurse certificates, etc; Accounting: junior and intermediate accounting titles, certified public accountant, tax agent, tax administrator; Teachers: qualification certificates for middle, primary and preschool teachers; National staff training; (The enrollment rate reaches 90%) Occupation: human resource manager; University: CET-4, CET-6, postgraduate entrance training companies mainly focus on online training, and combine online and offline training to contact us.

Doka Floor Prop Nut

[Multiple choices] The following items belong to measure project fee ().

Project pollution discharge fee C.

Cost for scaffolding works 3.

The content includes: safe and civilized construction cost (including environmental protection cost, civilized construction cost, safe construction cost, temporary facilities cost), additional cost for night construction, secondary handling cost, additional cost for winter and rainy period construction, completed project and equipment protection cost, project positioning retest cost, additional cost for construction in special areas, large mechanical equipment mobilization and demobilization, installation and removal cost, scaffolding engineering cost.

Safety construction fee 2.

[Single choice] According to the composition of the construction and installation cost, other project costs do not include ().

44), the following costs are stipulated ().

Labor union expenditure D.

[Answer] ABCE [Analysis] This question examines the composition and preparation requirements of the bill of quantities.

[Single choice] According to the Project Composition of Cost for Building and Installation Works (JB [2013] No.

Cost for re measurement of project positioning C.

Provisional sum B.

General contracting service fee D.

Other project fees include: provisional sum, provisional estimate, daywork and general contracting service fee.

The fees include: social insurance premiums (including endowment insurance premiums, unemployment insurance premiums, medical insurance premiums, maternity insurance premiums, and industrial injury insurance premiums), housing fund, and project sewage charges.

Additional cost for construction in special areas B.

Daywork C.

Tags:

Related Post

Henan │ vigorously develop prefabricated buildings, Kaifeng nine departments print and distribute the implementation plan of green building creation actionHenan │ vigorously develop prefabricated buildings, Kaifeng nine departments print and distribute the implementation plan of green building creation action