Dalian landmark caught fire yesterday! See this picture, break the defense instantly


Stop the owner’s illegal charging of electric vehicles, and report to the fire department and police station

.

Electric vehicles are not parked and charged in the building, and batteries are not charged in the balcony, living room, etc

.

After emergency rescue by various forces, as of 23:00 on August 27, the open fire on the site had been extinguished

.

At the slightest, it damages property, and at the worst, it kills people

.

Understand the use method of manual fire alarm button and the position of manual alarm button in the building

. Magnetic Box Adapter

Seeing this picture, netizens instantly broke the defense: “where is the quiet time? I hope the firefighters return safely!” According to @ Dalian fire: at 16:02 today, Dalian fire rescue detachment received an alarm that the exterior wall materials of block B of Triumph International in the development zone were on fire

.

The personnel are not in the building during the fire

.

Micro fire stations shall be set as required, equipped with necessary fire-fighting equipment, regular training and drill

.

After the community telephone contact, confirmed door-to-door and person by person, and the fire rescue personnel arranged layer by layer, no trapped people were found in the building, and no casualties were found

.

Learn fire control knowledge, standardize the use of electrical appliances and gas, and do not use open fire in violation of regulations

.

For high-rise building management units, fire emergency is very difficult

.

Triumph International Building is located at the entrance of Jinshan mountain, Jinma Road, Jinpu new area

.

As of 23:00 on August 27, the fire in the building has been extinguished, and the residual fire is being cleaned up on the site, with no casualties

.

Article 9    The owners and users of high-rise residential buildings shall perform the following fire safety obligations: (1) abide by the fire safety matters agreed in the Convention on fire safety in residential areas and the management regulations( 2) Use the building according to the purpose specified in the real estate ownership certificate( 3) Cooperate with the fire service unit in fire safety work( 4) Bear the cost of fire service and the cost related to the maintenance, renewal and transformation of building fire-fighting facilities in accordance with the law( 5) Maintain fire safety, protect fire-fighting facilities, prevent fire, report fire alarm, and adults participate in organized fire fighting( 6) Other fire safety obligations stipulated by laws and regulations

.

Elevator control system can be installed in the elevator to prevent electric vehicles from going upstairs through the elevator

.

It is an apartment building

.

Don’t leave people when the kitchen is on fire

.

At present, the fire site is being cleaned up, hidden dangers are being investigated, and the detailed cause of the fire is being investigated

.

Video source network, I hope you can improve your prevention ability.

.

At about 16:00 on August 27, there was a fire in Triumph International Building in Jinpu new area

.

Strengthen the construction of centralized charging shed and intelligent charging pile in the community, meet the fire safety requirements, and set up automatic fire extinguishing and automatic alarm devices

.

The personnel in the fire control room are on duty for 24 hours with certificates, and can skillfully operate the fire host and other facilities

.

At the same time, they also need to guide personnel to avoid danger according to the size of the fire, which requires a lot of manpower

.

After the fire, they have to climb the building to the site for self rescue and fire fighting

.

It is forbidden to use inflammable and combustible materials as external thermal insulation materials for external walls of high-rise civil buildings

.

In last night’s rescue, Dalian fire control used 101 meter high platform fire engines to continuously shoot the residual fire! As of 22:00 p.m

.

Ensure that the automatic alarm equipment works normally, the fire hydrant control system is in automatic working state, and the pressure of indoor fire hydrant pipe network meets the requirements

.

As of 23:00 on August 27, the open fire of Triumph International Building in Jinpu new area had been extinguished without casualties

.

Property service units: widely carry out fire safety knowledge education to improve owners’ fire safety awareness

.

The owner went to the property for help

.

After receiving the alarm, all relevant departments in the new area quickly started the emergency plan, and relevant provincial, municipal and district leaders and fire and emergency departments rushed to the scene at the first time to coordinate and organize rescue

.

After the property arrived, the room was full of smoke, and then called the police

.

If the external insulation system of the outer wall of high-rise civil buildings is damaged, cracked or fallen off, it shall be repaired in time

.

Huachen Fire Protection Suggestion: owner: it’s safe to be careful

.

But how many forces can the property participate in emergency disposal? Therefore, the best policy for property service units is to do a good job in daily management and prevent fire

.

No combustibles shall be placed around electrical appliances and open fires

.

Although the occurrence of fire has a certain contingency and is a small probability event, if you do not take precautions in advance, once a fire occurs, it will cause painful losses

.

For high-rise civil buildings that use flame-retardant exterior wall external insulation materials or adopt building exterior wall external insulation system with cavity with base wall and decorative layer, hot work and power consumption on their exterior wall are prohibited

.

Understand the performance and operation methods of fire-fighting facilities (fire extinguishers and fire hydrants)

.

Article 47    In case of any of the following acts in violation of these Provisions, the fire rescue organization shall order it to make corrections, impose a fine of not less than 2000 yuan but not more than 10000 yuan on the business unit and individual, and impose a fine of not less than 500 yuan but not more than 1000 yuan on the non business unit and individual: (III) failing to set up suggestive and warning signs for the external thermal insulation materials of the external wall, or failing to repair the damage in time Cracking and falling off of external wall external insulation system; At the same time, the regulations on fire safety management of high-rise civil buildings clarify the owner’s fire safety responsibility: Article 4   The owners and users of high-rise civil buildings are the main body responsible for the fire safety of high-rise civil buildings and are responsible for the fire safety of high-rise civil buildings

.

The local street staff evacuated more than 1800 people from Triumph International Building and surrounding residents

.

The fire quickly spread to the outer wall

.

Teach children not to play with fire

.

Ensure that the fire lane and fire rescue site meet the specification requirements and ensure the normal passage of fire engines

.

Up to now, the detachment command center has dispatched 24 fire stations, 68 fire engines and 366 firefighters to rescue at the scene

.

 “ It really hurts! ” Salute the most beautiful rebel! The regulations on fire safety management of high-rise civil buildings implemented on August 1 this year put forward clear requirements for fire safety management of external insulation layer of existing buildings: Article 19    For high-rise civil buildings equipped with external thermal insulation system of building exterior wall, the management unit shall set up suggestive and warning signs at the main entrance and relevant prominent positions around, indicating the combustion performance and fire prevention requirements of external thermal insulation materials of exterior wall

.

Independent fire alarm shall be installed indoors

.

During the construction of exterior wall external thermal insulation system of high-rise civil buildings, the construction unit shall take necessary fire isolation and measures to restrict people and use, so as to ensure the safety of personnel in the building

.

It is also understood that other rehabilitation work has also been carried out in an orderly manner, and the residents in the building have been properly placed in temporary living places such as hotels

.

Remember how to call the property control room and duty room and call 119 to report the fire

.

on the 27th, the fire was under control! At the scene of the fire, firefighters stood on the roof not far from the fire with water guns, and black smoke billowed around

.

At present, there are 419 households and 818 people living in it

.

Relevant experts have arrived at the site to assess the construction safety

.

The power supply and gas of the building were cut off in time

.

At about 16:00 on August 27, a fire broke out in a household on the 19th floor of the building

.

If the owner or user of a high-rise civil building is a unit, its legal representative or main person in charge is the person in charge of fire safety of the unit

.

Formulate targeted emergency plans and conduct drills (the owner or property user in the building is the first to arrive at the fire site to put out the fire)

.

After the fire, the Dalian fire rescue detachment rushed out to carry out rescue

.

It is forbidden to set off fireworks and firecrackers in the building and surrounding forbidden areas; It is forbidden to stack combustibles around its outer wall

.

Tags:

Related Post

Embrace building informatization, and BIM should be the “pacesetter” to receive the [2022 in-depth analysis report of building BIM industry]Embrace building informatization, and BIM should be the “pacesetter” to receive the [2022 in-depth analysis report of building BIM industry]

The advantages of new construction methods of standardization, modularization, industrialization and assembly have been highlighted, further promoting the application of prefabricated buildings, digital technology and intelligent construction technology in the