Extension of construction qualification in Enshi Prefecture


For illegal buildings confiscated only due to illegal planning on transferred state-owned land, they shall be reported to the planning and land department for approval due to the needs of public interests With the approval of the people’s government that originally approved the land use or the people’s government with the approval power, the state-owned land use right can be recovered with compensation according to legal procedures, and monetary compensation can be given according to the principle of equal value.

The guidance puts forward the definition and requirements for the implementation of confiscated illegal buildings, and plans for the asset disposal of confiscated illegal buildings.

(www.zhaocaimao8.

With more than 10 years of intensive cultivation, our business has covered the whole southwest region and promoted to the whole country.

198).

     Recently, the reporter learned from the latest issue of the official gazette that the guidance on the implementation and disposal of confiscated illegal buildings (hereinafter referred to as the guidance) has been officially issued with the consent of the municipal government.

For those who illegally occupy state-owned land or do not use state-owned land according to the approved purpose, they shall be ordered or recover the right to use state-owned land free of charge according to law.

1), Interim Provisions on promoting the supply of land for residential commercial housing (SGT [2015] No.

Tibet (Tibet), Hubei (Hubei), Anhui (Anhui), Jiangsu (Jiangsu), Shanghai (Shanghai), Zhejiang (Zhejiang), Fujian (min), Hunan (Hunan), Jiangxi (GAN), Sichuan (Sichuan, Shu), Chongqing (Chongqing) , Guizhou (Guizhou, Guizhou), Yunnan (Yunnan, Yunnan), Guangdong (Guangdong), Guangxi (Guangxi), Hainan (Hainan), Hong Kong (Hong Kong), Macao (Macao), Taiwan (Taiwan).

Com) is referred to as zhaocaimao.

721) and the measures of Shenzhen for improving the supply mechanism of industrial land and expanding the space of industrial land (for Trial Implementation) (SFB [2013] No.

226), opinions on promoting the imperfect land acquisition and transfer procedures and the overall planning of interests in land preparation for open space and land for major industrial projects.

The transfer mode is mainly referred to Several provisions on land use right transactions of non-agricultural construction land and land requisition return land of former rural collective economic organizations in Shenzhen (Shenfu [2011] No.

The specific standards can be implemented with reference to the relevant provisions of the municipal government on land acquisition compensation.

Plate Anchor

Zhaocaimao headquarters is located in Chengdu, Sichuan, a “Little Hong Kong” in Southwest China, enjoying a “land of abundance” Laudatory name.

  According to the guidance In terms of enforcement procedures, if the party concerned fails to implement the administrative penalty decision within the time limit after the administrative penalty decision takes effect, the planning and land supervision institution that made the administrative penalty decision shall issue a notice to the party concerned.

  Zhaocaimao enterprise processing consulting (Sichuan) Co., Ltd.

If the party concerned neither brings a lawsuit nor cooperates with the transfer at the expiration of the statutory time limit, or applies for administrative reconsideration or brings an administrative lawsuit, the administrative penalty decision is upheld and the litigation request is rejected The planning and land supervision institution that made the decision on administrative punishment shall apply to the court for compulsory execution according to law.13881983131.

According to the guidance , Shenzhen Municipal and district financial authorities are the receiving units of confiscating illegal buildings; if illegal buildings are confiscated, they will be transformed into state-owned assets at the legal level.

Professional contracting qualification for construction: Environmental protection, decoration, electromechanical equipment, building curtain wall, ancient architecture and city And road lighting, electronics and intelligence, fire protection, waterproof, anti-corrosion and thermal insulation, steel structure, formwork and scaffold, foundation, lifting equipment, ready mixed concrete, bridge, tunnel, highway pavement, highway subgrade, highway transportation, railway electricity, railway track laying and girder erection, railway electrification, airport runway, civil aviation air traffic control, airport visual navigation aid, port and coast, waterway Navigable buildings, port and shipping equipment and water traffic management, hydraulic metal structure fabrication and equipment, water conservancy and hydropower electromechanical equipment, river and lake regulation, power transmission and transformation, nuclear engineering, offshore oil and special services.

It is a company approved and registered by the Administration for Industry and commerce, providing qualification, qualification handling, qualification agency, qualification transfer of various construction engineering qualifications, handling safety production licenses and providing talent services for construction enterprises (class I and class II constructor, middle and senior engineer, technician certificate, etc.) Enterprise management consulting company, providing efficient resource services for enterprise development.

The overall planning mode mainly refers to the measures for the management of pilot projects for overall planning of land preparation interests (Trial) (shengtu [2015] No.

provides you with the latest construction information.

service guide.

Tel: 13881983131 zhaocaimao construction wechat: 13881983131 Henan zhaocaimao Construction Engineering Consulting Co., Ltd.

At present, there are more than 500 employees, the proportion of professional and technical personnel is more than 60%, and the number of registered technical talents with medium and high-grade technical titles and more than class I qualifications ranks in the forefront of the operation.

  The confiscation of illegal buildings mentioned in the Guiding Opinions refers to the buildings, structures and ancillary facilities that are illegally constructed in violation of land management or urban and rural planning laws and regulations, investigated and confiscated by the planning land supervision organization according to law.

I.

The expropriation mode is mainly handled with reference to several provisions on land acquisition and resettlement compensation and land replacement (Trial) (Shenfu [2015] No.

  For the disposal of confiscated illegal buildings on the land with incomplete land acquisition and transfer procedures, the guiding opinions designs three modes: expropriation, transfer and overall planning.

81).

  For the disposal of confiscated illegal buildings on state-owned land, the method of recovering state-owned land is mainly adopted.

Planned cities: Beijing (Beijing), Tianjin (Tianjin), Heilongjiang (HEI), Jilin (Ji), Liaoning (Liao), Hebei (Ji), Henan (Yu) and Shandong (Lu) , Shanxi (Jin), Shaanxi (Shan), Inner Mongolia (Inner Mongolia), Ningxia (ning), Gansu (long, GaN), Xinjiang (Xin), Qinghai (Qing).

We started in Chengdu and took Shu as the mainland.

After the land is recovered, the planning and land department can formulate a transfer scheme according to the actual situation and the current construction situation, and The appraisal price shall be an integral part of the transfer price of land and real estate.

  The guiding opinions clearly points out that the disposal of confiscated assets adheres to the principle of protecting state-owned assets, takes the district government (New Area Management Committee) as the leading, distinguishes between state-owned land and land with incomplete expropriation and transfer procedures, and comprehensively formulates classified disposal plans.

General contracting qualification for construction: construction, municipal administration, electric power, electromechanical equipment, highway, railway, port and waterway, water conservancy and hydropower, mining, metallurgical quality, chemical petroleum and communication.

Tags:

Related Post

Preliminary, intermediate and advanced examination syllabus of economic professional and technical qualification examination (ArchitecturePreliminary, intermediate and advanced examination syllabus of economic professional and technical qualification examination (Architecture

Understand the project legal person responsibility system and capital fund system, and distinguish the functions and powers of the project legal person; Understand the project supervision system, summarize the scope