From today on, the second Construction Co., Ltd. of China Construction * bureau shall not contract new projects in Jiangsu Province


6.

2 Construction Co., Ltd.

Common tools in the working process are not placed in the tool bag and are placed randomly; 2.

Safety monitoring is not in place.

The demolished materials are thrown and stacked randomly, and even directly throw construction materials, sundries and construction waste to the ground instead of being lifted down by crane or bagged with hemp rope; 3.

Personnel entering the construction site must wear safety helmets correctly.

4、 Personal labor protection measures are not comprehensive, safety technology and management measures are not in place, and non-standard construction methods are used, resulting in the unsafe state of objects: 1.

The coverage of the protective shed shall be greater than the influence range of objects that may fall from the construction above.

1.

Reliable sealing measures shall be taken for the bottom layer of cantilever scaffold and attached lifting scaffold.

In terms of construction organization and management, the person in charge of construction pays insufficient attention to cross operation, and arranges two or more groups of construction personnel to work at the top and bottom of the same operation point at the same time, resulting in cross operation; 2.

legal representative: sun * Chun project leader Supervisor: sun * Chun Supervisor: Zhejiang Heng * Engineering Management Co., Ltd.

2、 People’s unsafe behavior personnel’s weak safety awareness leads to unsafe behavior such as illegal operation: 1.

The following is the full text of the accident notification of China Construction * Bureau Group No.

When the stamping steel scaffold board is used for the operation layer of the operation platform or scaffold, the punching diameter of the board surface shall be less than 25mm.

8.

It is hereby notified as follows: accident project: Shentong (Taizhou) smart logistics e-commerce Industrial Park project.

The scaffold board of the object is not fully paved or laid irregularly, and the working surface is lack of skirting board; 4.

Cross the warning area at will and do not walk in the specified safe passage.

7.

2 Construction Co., Ltd.

9.

The gap between the lower edge of the lower toe board of the edge protective railing and the bottom surface shall not be greater than 10mm.

Common object strike types of Jiangsu Provincial Department of housing and urban rural development on January 20, 2022 ● during high-altitude operation, people are injured due to falling objects such as, tools, parts, bricks and tiles, wood blocks and so on; ● people are injured by littering wastes and sundries; ● materials fall and injure people during hoisting, disassembly and formwork removal; ● when the equipment is operating with faults, objects in the equipment fly out and hurt people; ● personal injury caused by flying objects from pressure vessel explosion; ● people are injured by stones during blasting operation.

For openings with short side length or diameter less than or equal to 500mm, blocking measures shall be taken.

Lifting Anchor

Personnel on the construction site shall not stay within the coverage of the crane and in areas where objects may fall..

According to relevant regulations, no new project shall be contracted in Jiangsu Province from today on.

at about 7:10 on January 18, 2022, the construction site of Shentong (Taizhou) smart logistics e-commerce Industrial Park project in Hailing District, Taizhou City, which was generally contracted by China Construction * Bureau Group No.

The main causes of object strike accidents are as follows 👇👇👇 1、 Construction management and safety supervision and management are not in place.

The prevention of object strike accidents shall be ▼ ▼ ▼ 1.

The stored materials shall be stacked stably, and the portable operation tools shall be put into the tool bag.

3.

The working passage shall be cleaned.

The materials are stacked near the edge and the hole, and the stacking exceeds the specified height and is unstable; 2.

11.

Failure to timely clean up the waste such as corner materials at high places leads to the falling of corner materials due to vibration, collision and other reasons.

The protection of flat net and dense mesh net is not strict, and the falling objects cannot be well sealed; 3.

When it is within the falling radius, safety protection shed or other isolation measures must be set.

The side slope of the working face near the edge shall be provided with blocking net or covered with steel wire mesh for protection.

One sided pursuit of progress, unreasonable arrangement of operation time, unreasonable organization of construction, requiring workers to work overtime, resulting in the lack of safety supervision; 3.

Accident location: east side of Jiegou Road, Jiulong Town, Hailing District, Taizhou city, Accident time on the north side of Yunhe Road: About 7:10 on January 18, 2022 casualties: one person died construction unit: Taizhou de * Logistics Co., Ltd.

The top surface of the first section of the protective arm well ring at the orifice of the Manually Excavated Pile shall be no less than 200mm higher than the bottom surface, and sundries shall not be accumulated around the orifice.

legal representative: he * Project Leader: Zhao * subcontractor: Anhui * Chao Construction Engineering Co., Ltd.

During cross operation, the lower operation position shall be outside the falling radius of the upper operation.

For more information, please check the historical news after paying attention.

The measures to prevent object strike shall be in accordance with the safety standard for the prevention and control of accidents prone to construction (JGJ / t429-2018) implemented on October 1, 2018.

All objects that may fall during work at heights and on the site shall be removed or fixed in advance.

Operators enter the construction site without wearing safety helmets as required, or the safety helmets are unqualified; 2.

legal representative: Ni * Wei project director: Zhu * Cang the safety production conditions of the above general contractor and subcontractor have been reduced.

The demolition operation shall comply with the following provisions: ① there shall be no other personnel under the demolition operation; ② It shall not be removed up and down at the same time; ③ A warning area shall be set up for demolition operation, and special personnel shall be arranged to monitor and guard; ④ The disassembled objects shall not be placed disorderly or discarded downward.

② Access roads and centralized processing sites within the influence range of objects that may fall from the upper construction.

There are no warning signs, guardrails or protective sheds around the demolition works.

5.

2 Construction Co., Ltd.

2.

Project Leader: sun * Da general contractor: China Construction * Bureau Group No.

10.

3、 The unsafe state of the object, the safety technology and management measures are not in place, and the use of non-standard construction methods causes the object to be in an unsafe state: 1.

③ A passage within the swing range of the crane’s jib.

4.

12.

and supervised by Zhejiang Heng * Engineering Management Co., Ltd, An object strike production safety accident occurred, resulting in one death.

From the construction of the building to the second floor, the upper part of the following parts shall be provided with safety protection shed: ① access for personnel (including the access of material elevator and construction elevator).

The safety protection shed should be built with section steel or steel plate or double-layer wooden plate, and can withstand the impact of falling objects.