The content of the serial number accounts for about 60% of the infrastructure part, about 12% of the rough masonry part, about 18% of the water and electricity installation part, and about 10% of the measure cost part.

If there is any infringement, please contact to delete it..

The cost of each part includes management fees, profits, fees, taxes and other charges.

Based on this, we can calculate the following proportion of a construction project: the infrastructure part accounts for about 60% of the total cost, and the masonry and rough decoration part accounts for about 12% of the total cost, The water and electricity installation part accounts for about 18% of the total cost, and the measure cost part accounts for about 10% of the total cost.

In total, 100% of the text is transferred from the network.

The content of serial number accounts for about 20% of the total cost.

1 Earthwork, foundation, masonry, concrete, reinforcement 50% 2, roof waterproof and thermal insulation, floor, wall and column surfaces, doors and windows, paint and coating 10% 3, water, electricity and heating 15% 4, formwork, scaffolding measures 8% 5, management fees, profits, fees, taxes 20%.

Bend Loop

The water, electricity, and heating account for about 15% of the project cost.

The formwork, The cost of scaffolding measures accounts for about 8% of the project cost, and the management fees, profits, fees and taxes account for about 20% of the project cost.

Generally, about 50% of the project cost is earthwork, foundation, masonry, concrete, and steel bars.

It is difficult to determine the proportion of the cost of sub projects in the whole project, because the project is constructed according to the drawings, and the amount of materials used in different sub projects is different according to the design.

The roof waterproof and thermal insulation, floor, wall and column surfaces, doors and windows, and paint and coating account for about 10% of the project cost.

Tags:

Related Post

The “Construction Site Safety Protection Standard Atlas” of China State Construction Corporation, with both graphics and text, can beThe “Construction Site Safety Protection Standard Atlas” of China State Construction Corporation, with both graphics and text, can be

Waved Anchor Engineering materials focus on sharing engineering materials. Click to follow and receive thousands of selected engineering materials such as China Construction Corporation’s high-quality construction team, 800 project compilations,

As a globally influential architectural firm, UNStudio has been continuously focusing on the integration of interconnected and parameterizedAs a globally influential architectural firm, UNStudio has been continuously focusing on the integration of interconnected and parameterized

“Algorithm design and logic generation” is the foundation of “full process digital design” for the future, and it is also a necessary path for the interdisciplinary transformation of architecture and