German style buildings outside the East Fifth Ring Road make life super convenient


In terms of shopping, there are supermarkets such as shibaijia, Auchan, Jingkelong and Hualian nearby, and Longhu Changying Tianjie is one station away from the subway.

Yiju also has a large living room.

Sister Feng commented that the apartment type of the Berlin Philharmonic community is very good.

In terms of transportation, it is 600m away from Huangqu station of line 6, and the north side is the East-West main road, Chaoyang North Road, which is relatively convenient to travel.

It is a non closed community, with no diversion of people and vehicles, and municipal central heating.

Phase III was completed in 2007.

However, the biggest disadvantage of the community is the semi open community, where people and vehicles are not diverted, resulting in confusion in the community and increased management difficulty.

The community is divided into four phases.

Video Number | Fengfeng says room Tiktok | Sister Feng says room..

and designed by German architects.

The property is Beijing Zhengzhong property, with a property fee of 1.8 yuan / month.

Two Hole Anchor

The slab building was completed in 2004.

It is not only transparent from the north to the south, but also has elevators.

The third and fourth phases of Yiju face south without any shelter.

It belongs to the Changying plate of Chaoyang District.

In addition, just in need friends can compare the apple pie and Vientiane Xintian.

Phase II was completed in 2004-2007.

Phase I was completed in 2003, with 12 buildings and 1217 households.

The environment of the community is also good, with east-west Wutong Avenue and internal garden landscape.

Buildings 36 and 37 were completed in 2007.

Except for the two bedrooms in the tower, the others are transparent from north to south, and most of them are double bathrooms.

In terms of education, there are aibaobao kindergarten, Xiyangyang kindergarten and Beijing Zhongde kindergarten in the community, and Beijing Zhongde school in the primary school.

The living room faces the South and has floor to ceiling windows.

There are 13 buildings, 1607 households in total.

The first floor has a garden, the top floor is duplex, and some have terraces.

It was constructed by Beijing urban and Rural Construction Co., Ltd.

Phase IV was completed in 2008.

There are 12 buildings, 1377 households in total.

In terms of house type, the north and South are mainly two bedrooms and three bedrooms.

Click the blue word to pay attention to our Berlin Philharmonic, also known as xinzhaojia Park, which is located between the East Fifth Ring Road and the sixth ring road.

There are 16 buildings, 2242 households in total.

The tower building was completed in 2005.

Tags:

Related Post

Who says that architecture can’t be done on the mountain? The boss will take you to solve the difficult problem (with PPT for site designWho says that architecture can’t be done on the mountain? The boss will take you to solve the difficult problem (with PPT for site design

Under the requirement of living comfort of low-density houses, the cost of earthwork, slope support, foundation and road engineering shall be reduced as far as possible. Earthwork analysis parking mode