How many methods do you know about construction engineering survey


In the early preparation of construction engineering, professional technical construction personnel often use the vertical measurement method to measure the building, and make detailed planning for the internal axis and finalization measurement, which is a more effective way in the whole construction engineering measurement stage

.

Through the above methods, the inspection degree of data can be effectively improved

.

In the actual control process, we need to install four high-performance concrete in the surrounding environment of the building to ensure that it can play the role of guaranteeing the benchmark during the construction period

.

QQ communication group 1019965127, password? Sesame open the door ~ ~ recommended reading ~ ~ manual calculation of reinforcement formula is the most pit dad’s staircase design in history, it’s hard to die! What is project pricing? Learn what matters need to pay attention to the cost of four skills, clever control of engineering supervision enterprise cost.

.

Vertical alignment control

.

In view of the above process, we need professionals to do a comprehensive analysis of the measurement of flat buildings, and focus on the comprehensive estimation of the internal structure

.

In this process, we need to ensure the rationality of the building structure and the actual construction quality, and on this basis, ensure that the preparatory work of the whole measurement should be within a precise control range

.

In the elevation transfer stage, the actual elevation is taken as the accurate fixed point, and the relevant equipment is used to apply it in the construction of the formulated floor

.

This measurement method can ensure that the internal monitoring points and the actual points are kept in a reasonable state

.

Considering the changing situation, the actual data floating law is calculated effectively

.

In the process of construction, the on-site construction personnel need to ensure the stability and accuracy of the actual punctuality, and regularly conduct internal audit and inspection according to the relevant management standards

.

Three, elevation control in the construction process of the building, the need for elevation control on the site, and in the whole process of construction, the use of benchmarks need to be within the supply range of the relevant departments

.

In this stage, on the premise of ensuring the level, the overall quality and efficiency of the whole construction are ensured

.

1、 Plane control in the actual construction engineering measurement process, will use the scientific theory of the whole project for comprehensive measurement, so as to evaluate the overall quality, from the overall survey has been refined to the local, and for the construction surface of the organization to analyze it, need to measure the specific axis intersection in the construction surface, need to go through repeated measurement, ensure the final number According to the accuracy of the project, the available information that can be estimated is submitted to the construction lofting

.

You know several methods of construction engineering survey

.

After completing the construction process of the above links, the previous elevation points need to be placed near the construction buildings

.

With the help of the axis planning, the point by point setting out is regulated to ensure that the straight line can be maintained on the side of the building, and then the side line and the surrounding control line are comprehensively tested

.

2

.

In the process of setting out, we should carefully evaluate the above key points, enlarge the local characteristics, and use the help of control network to determine the location of buildings

.

In the process of vertical alignment survey, we need to ensure the accuracy of projection on the position, arrange the specific control points in detail, and ensure the quality of the whole survey process

.

In addition, we need to set up the corresponding environmental control network in the surrounding area to evaluate the overall internal structure

.