How to do the fire safety work of construction site in winter? Be sure to remember these eight points!


It is strictly prohibited to use electrical lines with aging insulation and hang objects on electrical lines.

According to the construction progress of the project under construction, the indoor fire hydrant system or temporary fire hydrant shall be installed synchronously, equipped with water gun and hose, and the fire main pipe shall be equipped with water pump adapter to meet the fire water supply requirements for fire fighting on the construction site.

Electrical equipment shall not be overloaded or used with faults.

Improve the fire disposal capacity of the construction site.

The construction area shall not be operated, used or inhabited.

Fire warning signs shall be set at key fire prevention parts or areas on the construction site.

Each construction unit shall strictly follow the key points and requirements of fire safety inspection on construction sites in winter, and inspect the construction site, temporary houses, office areas, staff dormitories, color steel plates, fire and electricity, fire-fighting facilities Carry out comprehensive self inspection and self correction according to the implementation of on duty and unit inspection.

In view of the actual problems such as the increase of fire risk in winter, the construction unit shall strictly implement the duty system, strengthen the night inspection of the accommodation area, establish a fire emergency team on the construction site, equip with sufficient equipment, strengthen training and training, and improve the ability to fight the initial fire and organize personnel evacuation.

Winter construction site fire safety work winter, construction site fire and power consumption increase, which is a high-risk season with frequent fire accidents.

Sixth, establish and improve the fire management system.

The core material of metal sandwich panel shall be class a non combustible material.

Key point 7: establish and improve the power consumption management system.

Point 8 establish and improve the gas management system.

The key fire prevention parts and each floor of the high-rise building under construction shall be equipped with an appropriate number of portable fire extinguishers, fire sandbags and other fire-fighting equipment in obvious and convenient places.

Point 2 the building components of dormitory and office buildings shall be made of class a non combustible materials.

Key point 3 fire truck access shall be set up and kept unblocked at the construction site.

Key point 1 the office area, living area and operation area of the construction site shall be set separately, and a safe distance shall be maintained; It is not allowed to set up staff dormitories in buildings that have not been completed.

The city’s construction sites were reminded to do a good job in fire prevention at construction sites in winter, and it was suggested that all construction sites should strengthen fire safety inspection, do a good job in fire prevention and avoid fire accidents.

Four requirements for fire safety work on construction sites: 1.

If any hidden danger is found, rectification shall be required, and any violation of laws and regulations shall be severely punished.

The gas storage bottle and its accessories shall be qualified, intact and effective; It is strictly prohibited to use oxygen cylinders with defective pressure reducers and other accessories, and acetylene cylinders with defective acetylene special pressure reducers, flashback preventers and other accessories.

Key point 5 when inflammable and explosive chemicals are used in construction, fire safety measures shall be formulated; Do not repack or seasoning in the workplace; The waste inflammable and explosive chemical hazardous materials after use shall be removed in time.

4 widely carry out fire protection publicity and warning education, and carry out targeted publicity and tips for hot work and welding on construction sites, power consumption in collective dormitories, parking of electric bicycles and other links.

3.

The shared places shall strictly implement the technical requirements for fire safety in shared places of accommodation, production, storage and operation, and take fire separation measures to ensure the safety of evacuation.

2.

The construction unit shall implement the main responsibility.

Strengthen the strict management of hot work on the construction site, and prohibit the use of open fire in places with fire and explosion hazards; If it is necessary to carry out open fire operation, the hot work department and personnel shall go through the approval procedures according to the fire management system, implement the on-site supervisor, and carry out hot work construction after confirming that there is no fire and explosion danger; Personnel of special types of work such as electric welding, gas welding and electrician must work with certificates.

At the same time, guide the workers on the construction site to clean up electric heaters, electric furnaces and other electrical equipment, and do a good job in fire safety around them…

Strengthen the fire safety supervision of the construction site, strengthen the inspection, check whether the construction and decoration are approved and filed according to the law, whether the fire responsibility system of the unit is implemented, and whether the fire control of the construction site and dormitory living area is in place.

It is strictly prohibited to refit the on-site power supply and consumption facilities without permission.

Burnt and scorched sockets and plugs shall be replaced in time.

During the expansion and reconstruction of existing buildings, the construction area and non construction area must be clearly divided.

Gas stoves, kerosene stoves, electric heaters, electric stoves and other electrical appliances are strictly prohibited in the temporary dormitory.

Fixing Socket Angular End

Key point 4: set up fire water source.